PUEBLO WEST, CO —
OSHA Inspection: PUEBLO GENERAL ABATEMENT LLC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PUEBLO GENERAL ABATEMENT LLC in 598 NORTH STATES AVENUE, PUEBLO WEST, CO 81007 (NAICS 562910). OSHA activity number 339249419.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PUEBLO GENERAL ABATEMENT LLC
- Site address
- 598 NORTH STATES AVENUE
- City
- PUEBLO WEST
- State
- CO
- ZIP
- 81007
- Mailing
- 2707 FARABAUGH LN, PUEBLO, CO 81005
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 562910
- Employees
- 2
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.1101 D01
- Issued
- Sep 20, 2013
- Abate by
- Oct 4, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.1101(d)(1): On a multi-employer worksite, the employer performing work requiring the establishment of a regulated area did not inform other employers on site of the nature of the employer's work with asbestos, of the existence of and requirements pertaining to regulated areas, and the measures taken to ensure that employees of such other employers are not exposed to asbestos: a) On or about July 29, 2013 and times prior employees were exposed to health issues when working on the removal of pipes containing asbestos from the locomotive . Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet Letter").
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.1101 D02
- Issued
- Sep 20, 2013
- Abate by
- Oct 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(d)(2): Asbestos hazards at a multi-employer work site were not abated by the contractor who created or controlled the source of asbestos contamination: a) On or about July 29, 2013 and times prior employees were exposed to health issues when working on the removal of pipes containing asbestos from the locomotive. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet Letter").
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 E01
- Issued
- Sep 20, 2013
- Abate by
- Oct 4, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.1101(e)(1): Regulated areas did not comply with the requirements 29 CFR 1926.1101(e)(2) through (e)(5): a) On or about July 29, 2013 and times prior employees were exposed to health issues when working on the removal of pipes containing asbestos from the locomotive. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet Letter").
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.1101 F01 I
- Issued
- Sep 20, 2013
- Abate by
- Oct 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(f)(1)(i): Where exposure monitoring was required under 29 CFR 1926.1101, the employer did not perform monitoring to determine accurately the airborne concentrations of asbestos to which employees were or potentially were exposed: a) On or about July 29, 2013 and times prior employees were exposed to health issues when working on the removal of pipes containing asbestos from the locomotive. The employer did not perform air monitoring to determine airborne concentrations of asbestos. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet Letter").
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G01
- Issued
- Sep 20, 2013
- Abate by
- Oct 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(g)(1): The employer did not use engineering controls and work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of the exposure: a) On or about July 29, 2013 and times prior employees were exposed to health issues when working on the removal of pipes containing asbestos from the locomotive. The employer did not use adequate engineering controls when removing piping cover with wraps containing asbestos. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet Letter").
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 I01
- Issued
- Sep 20, 2013
- Abate by
- Oct 4, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.1101(i)(1): The employer did not provide or require the use of protective clothing such as coveralls or similar whole-body clothing, head coverings, gloves, and foot coverings for employees performing Class I work which involved the removal of over 25 linear or 10 square feet of thermal system insulation or surfacing asbestos containing material and presumed asbestos containing material: a) On or about July 29, 2013 and times prior employees were exposed to health issues when working on the removal of pipes containing asbestos from the locomotive. The employer did not provide employees with appropriate clothing when removing piping cover with wraps containing asbestos. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet Letter").
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.1101 J01 I
- Issued
- Sep 20, 2013
- Abate by
- Oct 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(j)(1)(i): The employer did not ensure that employees entered and exited the regulated area through the decontamination area: Note: This requirement applies to Class I operations involving over 25 linear or 10 square feet of thermal system insulation or surfacing containing asbestos-containing material or presumed asbestos-containing material: a) On or about July 29, 2013 and times prior employees were exposed to health issues when working on the removal of pipes containing asbestos from the locomotive. The employer did not provide employees with an adequate decontamination area when exiting the area where the pipes were being removed from the locomotive. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet Letter").
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Pueblo General Abatement LLC
View Pueblo General Abatement LLC's full OSHA safety record →
More inspections in this industry (NAICS 562910)
More inspections in CO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339249419.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.