GAINESVILLE, GA —
OSHA Inspection: ORDNER CONSTRUCTION COMPANY, INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of ORDNER CONSTRUCTION COMPANY, INC. in 150 PEARL NIX PARKWAY, GAINESVILLE, GA 30501 (NAICS 236220). OSHA activity number 339293292.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ORDNER CONSTRUCTION COMPANY, INC.
- Site address
- 150 PEARL NIX PARKWAY
- City
- GAINESVILLE
- State
- GA
- ZIP
- 30501
- Mailing
- 1600 EXECUTIVE DRIVE SOUTH, SUITE 100, DULUTH, GA 30096
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 20
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.451 G04 I
- Issued
- Aug 16, 2013
- Abate by
- Aug 28, 2013
- Penalty
- Initial $3,080 · Current $3,080
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. On or about 08/08/2013 at 150 Pearl Nix Parkway Gainesville, GA; employees performing bricklaying operations were exposed to a 32' fall to the lower level where there were no endrails installed at the working level.
Recent events (1)
- — Z (S) $3080
1926.451 H01
- Issued
- Aug 16, 2013
- Abate by
- Aug 28, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. For falling objects too large, heavy or massive to be contained or deflected, the employer did not place and secure such potential falling objects away from the edge of the surface from which they could fall. On or about 08/08/2013 at 150 Pearl Nix Parkway Gainesville, GA; employees performing bricklaying operations were exposed to struck-by hazards from approximately 32' to the lower level where there were no toeboards installed.
Recent events (1)
- — Z (S) $0
1926.451 B01
- Issued
- Aug 16, 2013
- Abate by
- Aug 28, 2013
- Penalty
- Initial $6,160 · Current $6,160
General-duty citation text
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports: On or about 08/08/2013 at 150 Pearl Nix Parkway Gainesville, GA; employees performing bricklaying operations were exposed to 30' falls to the lower level where the working level was not fully decked. Ordner Consrtuction Company, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.451(b)(1), which was contained in OSHA inspection number312977929, citation number 01 item number 001(a) and was affirmed as a final order on 04/26/2010, with respect to a workplace located at 4413 Birkland Place Easton, PA.
Recent events (1)
- — Z (R) $6160
1926.451 E01
- Issued
- Aug 16, 2013
- Abate by
- Aug 28, 2013
- Penalty
- Initial $6,160 · Current $6,160
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. On or about 08/08/2013 at 150 Pearl Nix Parkway Gainesville, GA; employees performing bricklaying operations were exposed to a 32' fall to the lower level where the ladder did not extend the full height of the scaffold to the working level and employees were observed scaling the scaffold frame beyond the reach of the ladder. Ordner Consrtuction Company, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.451(e)(1), which was contained in OSHA inspection number312977929, citation number 01 item number 002 and was affirmed as a final order on 04/26/2010, with respect to a workplace located at 4413 Birkland Place Easton, PA.
Recent events (1)
- — Z (R) $6160
More inspections at Ordner Construction Company, INC.
View Ordner Construction Company, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339293292.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.