OSHA Inspection: PUNA GEOTHERMAL VENTURE

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PUNA GEOTHERMAL VENTURE in 14-3860 KAPOHO-PAHOA ROAD, PAHOA, HI 96778 (NAICS 221116). OSHA activity number 339332793.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Puna Geothermal Venture — free Get an email when a new federal OSHA severe-injury report for Puna Geothermal Venture is published. One employer, no account, unsubscribe in one click.
Site address
14-3860 KAPOHO-PAHOA ROAD
City
PAHOA
State
HI
ZIP
96778
Mailing
14-3860 KAPOHO-PAHOA ROAD, PAHOA, HI 96778
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
221116
Employees
30
Ownership type
A

7 citations on file for this inspection.

1910.119 D03 I D

Other-than-serious 2 instances 8 exposed
Issued
Dec 12, 2013
Abate by
Dec 27, 2013
Penalty
Initial $7,000 · Current $1,000 Reduced
29 CFR 1910.119(d)(3)(i)(D):  Process safety information pertaining to the equipment in the process did not include the relief system design and design basis.        The employer does not ensure process safety information pertaining equipment in the process included the relief system design and design basis.      The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure the design and design basis of the relief systems for the pressure vessels was included in the process safety information. Identified relief systems include but are not limited to:    a.      Relief Valve(s) on Discharge of turbine to the condensers   b.      Relief Valve(s) on Vaporizer Separators       This condition exposed employees to fire and explosion hazards.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure process safety information pertaining equipment in the process included the relief system design and design basis.
Recent events (2)
  • — I (O) $1000
  • — Z (S) $7000

1910.119 E05

Serious Gravity 10 4 instances 8 exposed
Issued
Dec 12, 2013
Abate by
Dec 27, 2013
Penalty
Initial $7,000 · Current $5,000 Reduced
29 CFR 1910.119(e)(5):  The employer did not establish a system to assure that the process hazard analysis team's recommendations are resolved in a timely manner and that the resolutions are documented:         The employer does not ensure a system is established to assure that the process hazard analysis team's recommendations are resolved in a timely manner and resolutions are documented.      The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure a system was established to assure that the 2008 process hazard analysis (PHA) team's recommendations were resolved in a timely manner and the resolutions documented. Recommendations include but not limited to:      a.     PGV.PHA.2009.01.03.01.03 - Consider determining if the existing Central Station Control (CSC) HVAC System draws fresh air through a vent, and if the vent is in a location designed to minimize the potential for toxic exposure to CSC personnel      b.     PGV.PHA.2009.01.03.03.01 - Consider installing remotely-operated isolation valves upstream and downstream of the Feed Pumps (30-PFXXX-11/25) and between the Level II Turbine (30-T-XXX-11/25) and Air-Cooled Condenser 30-HE -XXX-11/25)       c.     PGV.PHA.2009.10.01.06.02 - The 2009 HAZOP Study Team noted that the Administration Trailers may be subject to Potential process hazards at their current location. Consider replacing the Administration Trailers or relocating them as Part of the current Puna Geothermal Venture expansion project     d.     PGV.PHA.2009.05.07.01.02 - The 2009 HAZOP Study Team noted that the Coalescer relief valve discharge point was at a fairly low elevation, increasing the potential or a release contacting an ignition source or resulting in an exposure hazard. Consider elevating the Coalescer PSV discharge point.      This condition exposed employees to fire and explosion hazards.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure a system is established to assure that the process hazard analysis team's recommendations are resolved in a timely manner and resolutions are documented.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $7000

1910.119 J05

Deleted Serious Gravity 10 1 instance 8 exposed
Issued
Dec 12, 2013
Abate by
Dec 27, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(5):  The employer did not correct deficiencies in equipment that were outside acceptable limits in a timely manner:     The employer does not ensure that deficiencies in the process equipment in a timely manner.    The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure the control room was operated under a positive pressure. This condition exposed employees to fire and explosion hazards.    Pursuant to 29 C.F.R. 1903.19, within (10) calendar days of the abatement date the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that equipment deficiencies are corrected in a timely manner.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 F01 II

Other-than-serious 5 instances 8 exposed
Issued
Dec 12, 2013
Abate by
Dec 27, 2013
Penalty
Initial $7,000 · Current $0 Reduced
29 CFR 1910.119(f)(1)(ii):  The employer's written operating procedures did not address the following requirements for the operating limits:           (A) Consequences of deviation      (B) Steps required correcting or avoiding deviation.      The employer does not ensure written operating procedures address the consequences of deviation and steps required for correcting or avoiding deviations from the safe upper and lower limits of the process.      The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure written operating procedures addressed the consequences of deviation and steps required for correcting or avoiding deviations from the safe upper and lower limits of the process. Identified operating limits include but not limited to:   a.       Vaporizer High Pressure   b.      Condenser High Pressure   c.       Steam Turbine Inlet Pressure   d.      Organic Turbine Bearing High Temperature   e.       Mechanical Seal Oil System High Pressure      This condition exposed employees to fire and explosion hazards.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure written operating procedures address the consequences of deviation and steps required for correcting or avoiding deviations from the safe upper and lower limits of the process.
Recent events (2)
  • — I (O) $0
  • — Z (S) $7000

1910.119 F03

Other-than-serious 2 instances 8 exposed
Issued
Dec 12, 2013
Abate by
Dec 27, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.119(f)(3):  The employer did not certify annually that the operating procedures are current and accurate.        The employer does not ensure standard operating procedures are certified annually as being current and accurate.      The employer does not ensure operating procedures are current and accurate and are certified annually.      A. The violation occurred in Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior where the employer failed to ensure written operating procedures were current and accurate. This condition exposed employees to explosion/fire hazards.    B.  The violation occurred in Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior where the employer failed to ensure written operating procedures were certified as being correct and accurate annually.  This condition exposed employees to explosion/fire hazards.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure operating procedures are current and accurate and are certified annually.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.119 J02

Serious Gravity 10 2 instances 8 exposed
Issued
Dec 12, 2013
Abate by
Dec 27, 2013
Penalty
Initial $7,000 · Current $5,000 Reduced
29 CFR 1910.119(j)(2):  The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment.        The employer does not ensure written procedures are established and implemented to maintain the on-going mechanical integrity of the process equipment.      A.  The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure that written procedures were established and implemented for the inspection and testing of process pressure such as but not limited to:    a.      Pentane Vaporizer     b.      Pentane Condensate Tank    c.      Pentane Preheater    d.      Pentane Separator    e.      Pentane Storage Vessels      B.  The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure that written procedures were established and implemented for the inspection and testing of pentane process piping such as but not limited to:    a.      Pentane Lines from Turbine to the Condenser (GCCU)    b.      Pentane Lines from the condenser to Preheater    c.      Pentane Lines from Preheater to the Vaporizer    d.      Pentane Lines from the Separator to the Turbine      This condition exposed employees to fire and explosion hazards.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure written procedures are established and implemented to maintain the on-going mechanical integrity of the process equipment.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $7000

1910.119 J04 II

Serious Gravity 10 2 instances 8 exposed
Issued
Dec 12, 2013
Abate by
Dec 27, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(4)(ii):  Inspections and testing procedures performed on process equipment to maintain its mechanical integrity, did not follow recognized and generally accepted good engineering practices.      The employer does not ensure inspections and tests performed on process equipment to maintain its on-going mechanical integrity followed recognized and generally accepted good engineering practices (RAGAGEP).    A.  The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure testing and inspections of process piping and vessels followed generally accepted good engineering practices such as but not limited to API 510. Identified equipment includes but not limited to:   a.     Pentane Vaporizer    b.     Pentane Condensate Tank   c.     Pentane Preheater   d.     Pentane Separator   e.     Pentane Storage Vessels    B.  The violation occurred in the Geothermal Combined Cycle Unit (GCCU) on or about August 19, 2013 and times prior thereto where the employer failed to ensure testing and inspections of process piping and vessels followed generally accepted good engineering practices such as but not limited to API 570. Identified equipment includes but not limited to:   a.    Pentane Lines from Turbine to the Condenser (GCCU)   b.    Pentane Lines from the condenser to Preheater   c.    Pentane Lines from Preheater to the Vaporizer   d.    Pentane Lines from the Separator to the Turbine    This condition exposed employees to inhalation hazards.  Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure inspections and tests performed on process equipment to maintain its on-going mechanical integrity followed recognized and generally accepted good engineering practices.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Puna Geothermal Venture's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339332793.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.