WASHINGTON, DC ·
OSHA Inspection: PANAMERICAN CONSTRUCTION
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of PANAMERICAN CONSTRUCTION in 1233 17TH STREET NE, WASHINGTON, DC 20002 (NAICS 236118). OSHA activity number 339356875.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PANAMERICAN CONSTRUCTION
- Site address
- 1233 17TH STREET NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20002
- Mailing
- 8809 CAMEO SQ, SPRINGFIELD, VA 22152
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 5
- Ownership type
- Private (A)
Citations
9 citations on file for this inspection.
1926.62 D01 I
- Issued
- Nov 29, 2013
- Abate by
- Dec 18, 2013
- Penalty
- Initial $1,800 · Current $900 Reduced
General-duty citation text
29 CFR 1926.62(d)(1)(i): Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 mg/m3) calculated as an 8-hour time-weighted average (TWA): On August 20, 2013 and at times prior thereto; front of residence; employees were removing wood, scrapping and sanding the paint from around the front window of the home without prior determination if lead may be present. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $900
- · Z (S) $1800
1926.62 D01 III
- Issued
- Nov 29, 2013
- Abate by
- Dec 18, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.62(d)(1)(iii): The employer did not collect personal samples representative of a full shift, including at least one sample for each job classification in each work area, either for each shift or for the shift with the highest exposure level: On August 20, 2013 and at times prior thereto; Front window; the employer had not taken samples of the paint that was being scrapped and sanded to determine if lead was present. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.304 H01
- Issued
- Nov 29, 2013
- Penalty
- Initial $2,520 · Current $1,260 Reduced
General-duty citation text
29 CFR 1926.304(h)(1): Each circular crosscut table saw was not guarded by a hood which completely enclosed that portion of the saw blade above the table and that portion of the saw above the material being cut: a) On August 20, 2013 and at times prior thereto; first floor; employees were using a table saw that was not properly guarded.
Recent events (2)
- · I (S) $1260
- · Z (S) $2520
1926.403 B01
- Issued
- Nov 29, 2013
- Abate by
- Dec 19, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.403(b)(1): Employer did not ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees: a) On August 20, 2013 and at times prior thereto; first floor, employees were operating a table saw which was not equipped with an anti-restart/magnetic switch to prevent it from accidental start up if the power was lost and re-engaged. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.404 B01 II
- Issued
- Nov 29, 2013
- Penalty
- Initial $1,080 · Current $540 Reduced
General-duty citation text
29 CFR 1926.404(b)(1)(ii): 29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection: a) On or about August 20, 2013; first floor; employees were using portable electrical equipment, such as but not limited to circular saws, that were plugged into outlets either directly or by portable extension cords which were not equipped with a ground fault circuit interrupter.
Recent events (2)
- · I (S) $540
- · Z (S) $1080
1926.404 F06
- Issued
- Nov 29, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) On August 20, 2013 and at times prior thereto; throughout site; the extension cords used by the employees to provide power to the portable electrical equipment such as but not limited to saws were missing the ground pin.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.405 B02
- Issued
- Nov 29, 2013
- Abate by
- Dec 18, 2013
- Penalty
- Initial $1,080 · Current $540 Reduced
General-duty citation text
29 CFR 1926.405(b)(2): All pull boxes, junction boxes, and fittings were not provided with covers: a) On August 20, 2013 and at times prior thereto; first floor; employees were using unguarded energized outlets either plugged in directly or by portable extension cords to power electrical equipment, such as but not limited to saws and other tools used in the process. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $540
- · Z (S) $1080
1926.405 D
- Issued
- Nov 29, 2013
- Abate by
- Dec 18, 2013
- Penalty
- Initial $1,800 · Current $900 Reduced
General-duty citation text
29 CFR 1926.405(d): Panelboards mounted in cabinets, cutout boxes or enclosures designed for the purpose were not dead front: a) On August 20, 2013 and at times prior thereto; lower floor; the electrical panel was not properly guarded exposing employees to the live conductors. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $900
- · Z (S) $1800
1910.134 C02 I
- Issued
- Nov 29, 2013
- Abate by
- Dec 18, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(c)(2)(i) as referenced by 29 CFR 1926.103: Respirator users were not provided with the information contained in Appendix D to 29 CFR 1910.134 when the employer determined that any voluntary respirator use was permissible: a) On August 20, 2013 and at times prior thereto, throughout site; the employer did ensure that the employees were provided with the information in Appendix D of this standard prior to the voluntary use of N95 respirators. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (O) $0
- · Z (O) $0
More inspections at Panamerican Construction
View Panamerican Construction's full OSHA safety record →
More inspections in this industry (NAICS 236118)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339356875.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.