Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,892Inspections Most recent open 2026-09-03 Last loaded 2026-09-07

OSHA Inspection: NICHOLS CONTRACTOR INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of NICHOLS CONTRACTOR INC. in 6TH STREET AND DELANCEY, PHILADELPHIA, PA 19106 (NAICS 238140). OSHA activity number 339357006.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Nichols Contractor INC. for free Get an email when a new federal OSHA severe-injury report for Nichols Contractor INC. is published. One employer, no account, unsubscribe in one click.
Site address
6TH STREET AND DELANCEY
City
PHILADELPHIA
State
PA
ZIP
19106
Mailing
6 WEST BROAD AVENUE, BERLIN, NJ 08009
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
Private (A)

2 citations on file for this inspection.

1926.451 G01 VII

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 19, 2013
Abate by
Oct 8, 2013
Penalty
Initial $2,200 · Current $2,200
29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  a) 6th Street and Delancey Street - Employees replacing brick from a tubular welded frame scaffold were exposed to a fall hazard of approximately thirty-one (31) feet without the use of a personal fall arrest system or guardrail systems.  Observed on or about August 27, 2013.
Recent events (1)
  • · Z (S) $2200

1926.451 E06 VI

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 19, 2013
Abate by
Oct 8, 2013
Penalty
Initial $2,200 · Current $2,200
29 CFR 1926.451(e)(6)(vi): Integral prefabricated scaffold access frames did not have a maximum spacing between rungs of 16 3/4 inches (43 cm). Non-uniform rung spacing caused by joining end frames together is allowed, provided the spacing does not exceed 16 3/4 inches (43 cm).  a) 6th and Delancey Street - Employees were not provided with a safe means of access and/or egress to the tubular welded frame scaffold platform, thus exposed to a fall hazard of approximately thirty-one (31) feet.  The spacing between rungs was approximately 21 inches.  Observed on or about August 27, 2013.
Recent events (1)
  • · Z (S) $2200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339357006.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.