WASHINGTON, DC —
OSHA Inspection: AA ROOFING COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of AA ROOFING COMPANY in 3810 5TH STREET, NW, WASHINGTON, DC 20005 (NAICS 238160). OSHA activity number 339364671.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- AA ROOFING COMPANY
- Site address
- 3810 5TH STREET, NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20005
- Mailing
- 4111 FORESTVILLE ROAD, FORESTVILLE, MD 20747
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 4
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.451 G01 I
- Issued
- Sep 27, 2013
- Abate by
- Oct 3, 2013
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system: a) West Side of the Building - A foreman and a roofer were observed on a ladder jack scaffold without fall protection exposing them to a 15 foot 3 inch hazard, on or about 08/29/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1926.451 E01
- Issued
- Sep 27, 2013
- Abate by
- Oct 3, 2013
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Cross braces were used as a means of access: a) West Side of the Building - A foreman and a roofer were observed on a ladder jack scaffold without having adequate ladder access exposing them to a 15 foot 3 inch hazard, on or about 08/29/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1926.501 B13
- Issued
- Sep 27, 2013
- Abate by
- Oct 3, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels was not protected by guardrail systems, safety net systems, personal fall arrest systems, or an alternative fall protection measure under another provision of paragraph 1926.501 (b), nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502: a) Roof of the Building - A roofer/foreman was observed without fall protection while on the upper roof exposing him to a 25 foot fall hazard, on or about 08/29/13. b) Roof Over the Front Porch - A roofer was observed without fall protection installing gutters exposing him to a 13 foot 4 inch fall hazard, on or about 08/29/13. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.1053 B01
- Issued
- Sep 27, 2013
- Abate by
- Oct 3, 2013
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1): Where a portable ladder was used for access to an upper level landing surface and the ladder's length did not allow the ladder side rails to extend at least 3 feet (0.9 m) above the upper landing surface being accessed, the ladder was not secured at its top to a rigid support that will not deflect, and/or a grasping device was not provided to assist employees in mounting and dismounting the ladder: a) East Side of the House, Porch Roof - A roofer was observed using an extension ladder which only extended 14 inches past the roofs edge exposing him to a 13 foot fall hazard, on or about 08/29/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1926.1053 B04
- Issued
- Sep 27, 2013
- Abate by
- Oct 3, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: a) Southeast Corner of the House - A carpenter was observed straddling across an 8 foot step ladder and was on the top rung exposing him to a 7 foot fall hazard, on or about 08/29/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238160)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339364671.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.