FORT WALTON BEACH, FL ·
OSHA Inspection: R.K.D., INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of R.K.D., INC. in 234 MIRACLE STRIP PARKWAY, FORT WALTON BEACH, FL 32547 (NAICS 238310). OSHA activity number 339371338.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- R.K.D., INC.
- Site address
- 234 MIRACLE STRIP PARKWAY
- City
- FORT WALTON BEACH
- State
- FL
- ZIP
- 32547
- Mailing
- P.O. BOX 4063, FORT WALTON BEACH, FL 32549
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238310
- Employees
- 4
- Ownership type
- Private (A)
Citations
5 citations on file for this inspection.
1926.100 A
- Issued
- Sep 10, 2013
- Penalty
- Initial $1,020 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a. On or about August 28, 2013, northeast side of the building, employees working underneath other employees on the scaffold system were not wearing hard hats, exposing themselves to head injuries. Abatement Certification and Documentation are not required
Recent events (2)
- · I (S) $1000
- · Z (S) $1020
1926.451 B01
- Issued
- Sep 10, 2013
- Penalty
- Initial $2,800 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about August 28, 2013, northeast side of the building, each working level of a two buck high scaffold system was not fully planked, exposing employees to an 11 feet fall hazard. Abatement Certification and Documentation are not required
Recent events (2)
- · I (S) $2000
- · Z (S) $2800
1926.451 G01
- Issued
- Sep 10, 2013
- Penalty
- Initial $2,800 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level: a. On or about August 28, 2013, northeast side of the building, employees working from a 2 buck high scaffold system were not protected from falling 11 feet by the use of a guardrail system, safety net system or personal fall arrest system. Abatement Certification and Documentation are not required
Recent events (2)
- · I (S) $0
- · Z (S) $2800
1926.451 H02 II
- Issued
- Sep 10, 2013
- Penalty
- Initial $1,020 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below: a. On or about August 29, 2013, northeast side of the building, the two buck high scaffold system did not have toeboards, exposing employees to head injuries. Abatement Certification and Documentation are not required
Recent events (2)
- · I (S) $0
- · Z (S) $1020
1926.451 E01
- Issued
- Sep 10, 2013
- Penalty
- Initial $1,700 · Current $1,670 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used: a. On or about August 29, 2013, northeast side of the building, the two buck high scaffold system did not have a safe means of acess or egress. The employees climbed the scaffold rungs. Abatement Certification and Documentation are not required
Recent events (2)
- · I (S) $1670
- · Z (S) $1700
More inspections in this industry (NAICS 238310)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339371338.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.