Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: C&N MASONRY INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of C&N MASONRY INC. in 500 W SHERIDIAN RD, OKLAHOMA CITY, OK 73102 (NAICS 238140). OSHA activity number 339411035.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch C&N Masonry INC. — free Get an email when a new federal OSHA severe-injury report for C&N Masonry INC. is published. One employer, no account, unsubscribe in one click.
Establishment
C&N MASONRY INC.
Site address
500 W SHERIDIAN RD
City
OKLAHOMA CITY
State
OK
ZIP
73102
Mailing
PO BOX 1038, BENTONVILLE, AR 72712
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
62
Ownership type
A

2 citations on file for this inspection.

1926.451 B01

Deleted Serious Gravity 10 1 instance 9 exposed
Issued
Sep 26, 2013
Abate by
Sep 30, 2013
Penalty
Initial $4,900 · Current $0 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds were not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):   On or about September 12, 2013, and at times prior there to, nine employees at the construction site were observed working from scaffolding that was not fully planked exposing employees to fall hazards.
Recent events (3)
  • — J (S) $0
  • — C (S) $4900
  • — Z (S) $4900

1926.451 F04

Deleted Other-than-serious 1 instance 9 exposed
Issued
Sep 26, 2013
Abate by
Sep 30, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(4): Part(s) of a scaffold that were damaged or weakened, such that the scaffold's strength was less than that required by paragraph (a) of this section, were not immediately repaired, replaced, braced to meet those provisions, nor removed from service until repaired:     On or about September 12, 2013, and at times prior there to, nine employees at the construction site were observed working from scaffolding planks that were cracked or split, exposing employees to fall hazards.
Recent events (3)
  • — J (O) $0
  • — C (O) $0
  • — Z (O) $0

View C&N Masonry INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339411035.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.