HOUSTON, TX —
OSHA Inspection: E.C. TUCKER ELECTRIC, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of E.C. TUCKER ELECTRIC, LLC in 855 FM 1960 WEST, HOUSTON, TX 77070 (NAICS 238210). OSHA activity number 339474629.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- E.C. TUCKER ELECTRIC, LLC
- Site address
- 855 FM 1960 WEST
- City
- HOUSTON
- State
- TX
- ZIP
- 77070
- Mailing
- 335 EXCHANGE DR., ARLINGTON, TX 76011
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238210
- Employees
- 4
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 B01
- Issued
- Nov 25, 2013
- Abate by
- Dec 2, 2013
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): The employer does not ensure that all working levels on scaffolding are fully planked or decked. This violation occurred on or about November 05, 2013, at a construction site when an employee was exposed to a fall hazard while installing electrical equipment using a scaffold without the working platform being fully planked or decked between the front uprights and the guardrail supports. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all working levels on all scaffolds are appropriately planked or decked.
Recent events (1)
- — Z (S) $2800
1926.451 C02
- Issued
- Nov 25, 2013
- Abate by
- Dec 2, 2013
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: The employer does not ensure that all supported scaffold poles, legs, posts, frames, and uprights are equipped with base plates and mud sills or other adequate firm foundation. This violation occurred on or about November 05, 2013, at a construction site where an employee was exposed to fall hazard while installing electrical equipment using a scaffold that was set up on a dirt foundation without base plates or mud sills. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all scaffolds are set up on base plates and mud sills or other adequate firm foundation.
Recent events (1)
- — Z (S) $2800
1926.451 G04 I
- Issued
- Nov 25, 2013
- Abate by
- Dec 2, 2013
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: The employer does not ensure that a guardrail system is installed on all working levels of scaffolds. This violation occurred on or about November 05, 2013, at a construction site when an employee was exposed to a fall hazard while installing electrical equipment using a scaffold without a guardrail system in place. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all scaffolds used by employees have a guardrail system installed that protects employees from falling from all open sides and ends of the platform.
Recent events (1)
- — Z (S) $2800
More inspections at E.C. Tucker Electric, LLC
View E.C. Tucker Electric, LLC's full OSHA safety record →
More inspections in this industry (NAICS 238210)
More inspections in TX