WASHINGTON, DC —
OSHA Inspection: MILLION CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MILLION CONSTRUCTION, INC. in 1601 BRENTWOOD RD., NE, WASHINGTON, DC 20018 (NAICS 236118). OSHA activity number 339480121.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MILLION CONSTRUCTION, INC.
- Site address
- 1601 BRENTWOOD RD., NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20018
- Mailing
- 8917 BURKE LAKE RD., SPRINGFIELD, VA 22151
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 4
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.451 E01
- Issued
- Nov 29, 2013
- Abate by
- Dec 5, 2013
- Penalty
- Initial $2,000 · Current $1,240 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used: a) The foreman climbed rungs that were not uniformed to access the scaffold, creating an approximate 13 foot 2 inch fall hazard to the ground below, on or about 11/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1240
- — Z (S) $2000
1926.451 G01 VII
- Issued
- Nov 29, 2013
- Abate by
- Dec 5, 2013
- Penalty
- Initial $2,000 · Current $1,240 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a) The foreman was on the scaffold without a proper guardrail system exposing him to an approximately 13 foot 2 inch fall hazard to the ground below, on or about 11/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1240
- — Z (S) $2000
1926.501 B13
- Issued
- Nov 29, 2013
- Abate by
- Dec 5, 2013
- Penalty
- Initial $2,000 · Current $1,240 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) The employee was standing on the porch roof without fall protection exposing him to an approximate 11 foot fall hazard to the ground below, on or about 11/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1240
- — Z (S) $2000
1910.134 K06
- Issued
- Nov 29, 2013
- Abate by
- Dec 11, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(k)(6): The employer did not provide the basic advisory information on respirators, as presented in Appendix D of 29 CFR 1910.134, in written or oral format to employees who wear respirators when such use was not required by the employer: a) Employees including the foreman were wearing N95 respirators for voluntary use but did not recieve the information contained in appendix D prior to the company providing the respirators, on or about 11/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Million Construction, INC.
View Million Construction, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236118)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339480121.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.