PAGO PAGO, AS —
OSHA Inspection: SCHWENKE & SONS
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SCHWENKE & SONS in FAGAIMA ROAD, TAFUNA, PAGO PAGO, AS 96799 (NAICS 238140). OSHA activity number 339495616.
Where did this inspection happen?
- Establishment
- SCHWENKE & SONS
- Site address
- FAGAIMA ROAD, TAFUNA
- City
- PAGO PAGO
- State
- AS
- ZIP
- 96799
- Mailing
- P.O. BOX 5348, PAGO PAGO, AS 96799
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 5
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.96
- Issued
- Penalty
- Initial $1080.00 · Current $1080.00
General-duty citation text
29 CFR 1926.96: The employer did not ensure employees wear proper footwear which meets the requirements and specifications in American National Standard for Men's Safety-Toe Footwear, Z41.1-1967. PID Bathroom Construction Project: On November 21, 2013; where employees were observed throughout the job site wearing open-toed shoes.
Recent events (1)
- — Z (S) $1080
1926.100 A
- Issued
- Penalty
- Initial $1080.00 · Current $1080.00
General-duty citation text
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns: PID Bathroom Construction Project: On November 21, 2013; where employees observed on the ground level without hard hats while another was working above them exposed employee below to the hazards of being struck by tools and equipment used by the employee working above.
Recent events (1)
- — Z (S) $1080
1926.404 F06
- Issued
- Penalty
- Initial $1020.00 · Current $1020.00
General-duty citation text
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: PID Bathroom Construction Project: On November 21, 2013; where employees were using the circular saw with the equipment grounding pin missing on the electrical cord.
Recent events (1)
- — Z (S) $1020
1926.501 B01
- Issued
- Penalty
- Initial $1020.00 · Current $1020.00
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface having an unprotected side or edge which was six or more feet (1.8m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. PID Bathroom Construction Project: On November 21, 2013; where at least one employee was observed on top of the form and was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.
Recent events (1)
- — Z (S) $1020
1926.1053 B13
- Issued
- Penalty
- Initial $1020.00 · Current $1020.00
General-duty citation text
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step: PID Bathroom Construction Project: On November 21, 2013; where an employee was observed using the top of the step of a ladder as a work platform.
Recent events (1)
- — Z (S) $1020
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in AS
PAGO PAGO, AS—2026-04-15
FTK CORPORATION
PAGO PAGO, AS—2026-04-15
TMP MASONRY CONSTRUCTION
PAGO PAGO, AS—2026-04-14
NNT INC.
PAGO PAGO, AS—2026-04-14
TONY'S CONSTRUCTION
PAGO PAGO, AS—2026-04-13
STEVENSON TRUCKING CORPORATION
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339495616.