Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ABLE CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ABLE CONSTRUCTION in 1013 V STREET NW, WASHINGTON, DC 20001 (NAICS 236118). OSHA activity number 339498560.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Able Construction — free Get an email when a new federal OSHA severe-injury report for Able Construction is published. One employer, no account, unsubscribe in one click.
Establishment
ABLE CONSTRUCTION
Site address
1013 V STREET NW
City
WASHINGTON
State
DC
ZIP
20001
Mailing
6203 DISTRICT HEIGHTS PARKWAY, DISTRICT HEIGHTS, MD 20747
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
5
Ownership type
A

2 citations on file for this inspection.

1926.25 A

Serious Gravity 1 1 instance 4 exposed
Issued
Jan 3, 2014
Abate by
Jan 9, 2014
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.25(a): During the course of construction, alteration, or repairs,  debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures;   a) Back Yard of Structure - Workers walking, working, cutting materials that were placed on top of other building materials and debris that covered the entire back yard, on or about 11/22/2013.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

1926.1052 C01 II

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 3, 2014
Abate by
Jan 9, 2014
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stairrail system along each unprotected side or edge:  a) Rear of Structure - Workers constructing an outside four level staiway, 7 step staircase used to reach next upper level were missing stairrails, on or about 11/22/2013.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

View Able Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339498560.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.