PERRYVILLE, MO —
OSHA Inspection: T-N-T PLASTICS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of T-N-T PLASTICS, INC. in 701 INDUSTRIAL DR., PERRYVILLE, MO 63775 (NAICS 326111). OSHA activity number 339502650.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- T-N-T PLASTICS, INC.
- Site address
- 701 INDUSTRIAL DR.
- City
- PERRYVILLE
- State
- MO
- ZIP
- 63775
- Mailing
- 701 INDUSTRIAL DR., PERRYVILLE, MO 63775
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326111
- Employees
- 37
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.23 E01
- Issued
- Dec 27, 2013
- Abate by
- Feb 14, 2014
- Penalty
- Initial $2,975 · Current $1,488 Reduced
General-duty citation text
29 CFR 1910.23(e)(1): Standard railing(s) did not consist of top rail, intermediate rail and/or posts and/or did not have a vertical height of 42 inches (106.7 cm) nominal from upper surface of top rail to floor, platform runway, or ramp level: a. At the extruder tower, instances existed where the top rail was not at the allowed height, between 39 and 42 inches, such as on the 3rd level, where the top rail was 33" around the outer perimeter, and on the 4th level where the top rail around the bubble column was at 47". b. At the extruder tower, instances existed where the outer perimeter rail was structured in a "W" pattern with openings between the vertical uprights, such as on the 3rd level. c. At the extruder tower, instances existed where there was no midrail around the bubble column, such as on the 3rd and 4th levels. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $1487.5
- — Z (S) $2975
1910.147 C04 I
- Issued
- Dec 27, 2013
- Abate by
- Feb 14, 2014
- Penalty
- Initial $1,785 · Current $893 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a. The lockout procedures had not been written for machines, such as, the converters. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $892.5
- — Z (S) $1785
1910.147 C04 II D
- Issued
- Dec 27, 2013
- Abate by
- Feb 14, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control: a. The lockout procedures did not include specific information on how to test the machine to verify energy isolation. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 II
- Issued
- Dec 27, 2013
- Abate by
- Feb 14, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: a. The lockout procedures and program was not annually certified. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Dec 27, 2013
- Penalty
- Initial $1,517 · Current $759 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by: a. At the #11 Sheldahl poly bag machine, the gear cover was not kept closed.
Recent events (2)
- — I (S) $758.5
- — Z (S) $1517
1910.304 G05
- Issued
- Dec 27, 2013
- Abate by
- Feb 14, 2014
- Penalty
- Initial $1,785 · Current $893 Reduced
General-duty citation text
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a. At least two instances existed of the ground pin missing from lift carts (110 V), used to move rolls. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $892.5
- — Z (S) $1785
1910.106 E02 II B 2
- Issued
- Dec 27, 2013
- Abate by
- Feb 14, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.106(e)(2)(ii)(b)(2): Flammable liquid located outside of an inside storage room or storage cabinet in a building or in any one fire area of a building exceeded 120 gallons: a. In the printing area, six 55 gal. drums of flammable liquid were stored on the work floor. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at T-N-T Plastics, INC.
View T-N-T Plastics, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 326111)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339502650.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.