PHILADELPHIA, PA ·
OSHA Inspection: ANGELO GOMEZ
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of ANGELO GOMEZ in 213 GREEN LANE, PHILADELPHIA, PA 19128 (NAICS 238140). OSHA activity number 339505695.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ANGELO GOMEZ
- Site address
- 213 GREEN LANE
- City
- PHILADELPHIA
- State
- PA
- ZIP
- 19128
- Mailing
- 3840 CAMAC ST, PHILADELPHIA, PA 19140
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 4
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.451 B01
- Issued
- Feb 7, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports: a) 213 Green Lane, Philadelphia, PA - The employees were working on a fabricated framed scaffold approximately 32 feet and 6 inches high, 5 feet wide and 35 feet long, which was not fully planked or decked on all working levels from the front uprights and the guardrail supports. This hazard exposed the employees to a fall hazard.This violation was observed on or about November 21, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2800
1926.451 C01 I
- Issued
- Feb 7, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(c)(1)(i): Guys, ties, and braces were not installed at locations where horixontal members support both inner and outer legs: a) 213 Green Lane, Philadelphia, PA - The employees were working on a fabricated framed scaffold approximately 32 feet and 6 inches high, 5 feet wide and 35 feet long, which was not restrained from tipping by using guys, ties or braces, thus exposing the employees to fall, struck-by and crushing hazards. This violation was observed on or about November 21, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2800
1926.451 C02
- Issued
- Feb 7, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) 213 Green Lane, Philadelphia, PA - The employees were working on a fabricated framed scaffold approximately 32 feet and 6 inches high, 5 feet wide and 35 feet long, which did not bear on base plates, thus exposing the employees to an unstable erected scaffold. This violation was observed on or about November 21, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- · Z (S) $0
1926.451 E01
- Issued
- Feb 7, 2014
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(e)(1): A means of access for scaffold platforms more than 2 feet above or below a point of access, such as portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or similar surface was not used: a)213 Green Lane , Philadelphia, PA - The employees were working on a fabricated framed scaffold approximately 32 feet and 6 inches high, 5 feet wide and 35 feet long, which did not have a ladder to access all of the working levels of the scaffold. The employees would climb the vertical supports in order to gain access to the working levels of the scaffold, thus exposing the employees to a fall hazard.This violation was observed on or about November 21, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2000
1926.451 G01 VII
- Issued
- Feb 7, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems: a) 213 Green Lane, Philadelphia, PA - The employees were working ranging from 10 to 32 feet above the ground on a fabricated framed scaffold approximately 32 feet and 6 inches high, 5 feet wide and 35 feet long which was not equipped with any guardrails to protect the employees from falling to the lower level, thus exposing the employees to a fall hazard greater than 10 feet. This violation was observed on or about November 21, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2800
1926.20 B01
- Issued
- Feb 7, 2014
- Abate by
- Mar 6, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.20(b)(1): The employer did not initiate and maintain accident prevention programs as necessary to comply with this part: a) 213 Green Lane, Philadelphia, PA - The employer did not maintain a safety/health program, thus exposing the employees to workplace hazards. This violation was observed on or about November 21, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $0
1926.451 F06
- Issued
- Feb 7, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer than 3 ft to exposed and energized power lines: a) 213 Green Lane, Philadelphia, PA - The employees were working on a fabricated framed scaffold approximately 32 feet and 6 inches high, 5 feet wide and 35 feet long, which was within approximately 3 feet of the energized (120/208 volts) power service lines, thus exposing the employees to a shock/electrocution hazard.This violation was observed on or about November 21, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2800
1926.452 C02
- Issued
- Feb 7, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.452(c)(2): Frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would secure vertical members together laterally: a) 213 Green Lane, Philadelphia, PA - The employees were working on a fabricated framed scaffold approximately 32 feet and 6 inches high, 5 feet wide and 35 feet long, which was missing approximately half of the cross bracing needed for the erected scaffold, thus exposing the employees to a collapse/struck-by hazard. This violation was observed on or about November 21, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2800
More inspections in this industry (NAICS 238140)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339505695.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.