Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: BRENHAM READY MIX

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of BRENHAM READY MIX in 2200 HWY 290 E, BRENHAM, TX 77834 (NAICS 327320). OSHA activity number 339510596.

Watch Brenham Ready MIX — free Get an email when a new federal OSHA severe-injury report for Brenham Ready MIX is published. One employer, no account, unsubscribe in one click.
Establishment
BRENHAM READY MIX
Site address
2200 HWY 290 E
City
BRENHAM
State
TX
ZIP
77834
Mailing
2200 HWY 290 E, BRENHAM, TX 77834
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327320
Employees
16
Ownership type
A

3 citations on file for this inspection.

1910.303 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $720.00 Reduced
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:  On or about December 4, 2013, non-metallic sheathed cable was not in conduit inside the panel box where employees operate a portable light, heat lamp, and meter, on the batch plant, exposing employees to an electrical hazard.
Recent events (2)
  • — I (S) $720
  • — Z (S) $1200

1910.305 G01 IV A

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $720.00 Reduced
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  On or about December 4, 2013, an extension cord used as permanent wiring was run through a hole in the wall of the batch plant panel box in order to power an external 110 volt light, exposing employees to an electrical hazard.
Recent events (2)
  • — I (S) $720
  • — Z (S) $1200

1910.305 G01 IV B

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors:   On or about December 4, 2013, an extension cord was run through a hole in the wall of the batch plant panel box in order to power an external 110 volt light, exposing employees to an electrical hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339510596.