OSHA Inspection: BRENHAM READY MIX

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of BRENHAM READY MIX in 2200 HWY 290 E, BRENHAM, TX 77834 (NAICS 327320). OSHA activity number 339510596.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Brenham Ready MIX for free Get an email when a new federal OSHA severe-injury report for Brenham Ready MIX is published. One employer, no account, unsubscribe in one click.
Establishment
BRENHAM READY MIX
Site address
2200 HWY 290 E
City
BRENHAM
State
TX
ZIP
77834
Mailing
2200 HWY 290 E, BRENHAM, TX 77834
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327320
Employees
16
Ownership type
Private (A)

3 citations on file for this inspection.

1910.303 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 31, 2014
Abate by
Feb 15, 2014
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:  On or about December 4, 2013, non-metallic sheathed cable was not in conduit inside the panel box where employees operate a portable light, heat lamp, and meter, on the batch plant, exposing employees to an electrical hazard.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

1910.305 G01 IV A

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 31, 2014
Abate by
Feb 15, 2014
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  On or about December 4, 2013, an extension cord used as permanent wiring was run through a hole in the wall of the batch plant panel box in order to power an external 110 volt light, exposing employees to an electrical hazard.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

1910.305 G01 IV B

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 31, 2014
Abate by
Feb 15, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors:   On or about December 4, 2013, an extension cord was run through a hole in the wall of the batch plant panel box in order to power an external 110 volt light, exposing employees to an electrical hazard.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339510596.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.