WASHINGTON, DC —
OSHA Inspection: REDWOOD VENTURES, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of REDWOOD VENTURES, INC. in 939/941 M STREET, NW, WASHINGTON, DC 20005 (NAICS 236116). OSHA activity number 339523623.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- REDWOOD VENTURES, INC.
- Site address
- 939/941 M STREET, NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20005
- Mailing
- 1434 PARK ROAD, NW, WASHINGTON, DC 20011
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236116
- Employees
- 2
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.501 B13
- Issued
- Jan 30, 2014
- Abate by
- Feb 5, 2014
- Penalty
- Initial $2,000 · Current $1,300 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) Roof of the Building - A laborer was observed without fall protection while on the roof positioning received materials exposing him to a 30 foot fall hazard, on or about 12/17/13. b) 3rd Floor - A project supervisor and a laborer were observed walking past the unguarded edge of the stairway opening exposing them to a 10 foot fall hazard into the opening, on or about 12/17/13. c) Top Floor Exiting onto Roof - A project supervisor and a laborer were observed walking past the unguarded edge of the stairway opening exposing them to a 10 foot fall hazard into the opening, on or about 12/17/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1300
- — Z (S) $2000
1926.1052 C01 I
- Issued
- Jan 30, 2014
- Abate by
- Feb 5, 2014
- Penalty
- Initial $1,200 · Current $800 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: a) Between the Basement and First Floors and Between the First and Second Floors - Project supervisor and a worker were observed using the stairs which was not equipped with a standard handrail exposing them to a 10 foot fall hazard, on or about 12/17/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $800
- — Z (S) $1200
1926.1052 C01 II
- Issued
- Jan 30, 2014
- Abate by
- Feb 5, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stair rail system along each unprotected side or edge: a) Between the Basement and First Floors and Between the First and Second Floors - Project supervisor and a worker were observed using the stairs which was not equipped with a standard stair rail exposing them to a 10 foot fall hazard, on or about 12/17/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 236116)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339523623.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.