OSHA Inspection: BUCKEYE FLORIDA, LIMITED PARTNERSHIP

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of BUCKEYE FLORIDA, LIMITED PARTNERSHIP in ONE BUCKEYE DR., PERRY, FL 32347 (NAICS 322121). OSHA activity number 339530412.

Watch Buckeye Florida, Limited Partnership — free Get an email when a new federal OSHA severe-injury report for Buckeye Florida, Limited Partnership is published. One employer, no account, unsubscribe in one click.
Site address
ONE BUCKEYE DR.
City
PERRY
State
FL
ZIP
32347
Mailing
ONE BUCKEYE DR., PERRY, FL 32347
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
322121
Employees
600
Ownership type
A

3 citations on file for this inspection.

1910.119 J05

Serious Gravity 10 1 instance 6 exposed
Issued
Penalty
Initial $7000.00 · Current $7000.00

Hazardous substances 0614

29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) before use:  a.   On or about, December 4, 2013, the stock flow differential pressure meter, a sensor input to the chlorine dioxide block valve interlock, was not operational, and the interlock had been bypassed, exposing employees to a chlorine dioxide gas release.
Recent events (2)
  • — I (S) $7000
  • — Z (S) $7000

1910.119 F01 I C

Serious Gravity 10 1 instance 6 exposed
Issued
Penalty
Initial $0.00 · Current $0.00

Hazardous substances 0614

29 CFR 1910.119(f)(1)(i)(C): The employer did not develop and implement written operating procedures that provide clear instructions for safely conducting temporary operations:  a.   On or about December 4, 2013, in the bleach plant, a written procedure was not implemented for temporary operations with the differential pressure meter interlock to the chlorine dioxide block valve in bypass.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.120 C05

Other-than-serious 1 instance 6 exposed
Issued
Penalty
Initial $7000.00 · Current $1400.00 Reduced

Hazardous substances 0614

29 CFR 1910.120(c)(5): Personal protective equipment was not provided and used during initial site entry in accordance with 29 CFR 1910.120(c)(5)(i) through (c)(5)(iv):    a.  On or about December 4, 2013, in the bleach plant, employees who responded to a chlorine dioxide gas release did not wear respirators during the initial response.
Recent events (2)
  • — I (O) $1400
  • — Z (S) $7000

View BUCKEYE FLORIDA, LIMITED PARTNERSHIP's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339530412.