COLUMBUS, OH ·
OSHA Inspection: FLAT WALL SYSTEMS, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FLAT WALL SYSTEMS, LLC in ELLINGTON CIRLCE, COLUMBUS, OH 43213 (NAICS 238140). OSHA activity number 339545311.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FLAT WALL SYSTEMS, LLC
- Site address
- ELLINGTON CIRLCE
- City
- COLUMBUS
- State
- OH
- ZIP
- 43213
- Mailing
- 1608 HANFORD ST., COLUMBUS, OH 43206
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 6
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 B01
- Issued
- Mar 10, 2014
- Abate by
- Mar 20, 2014
- Penalty
- Initial $3,080 · Current $1,078 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports. a. At the construction site located at Building #3 on Ellington Circle, Columbus, Ohio, employees were installing stucco from the second level, approximately twelve feet, of a five level scaffold that was not fully planked exposing the employee to a fall hazard.
Recent events (2)
- · I (S) $1078
- · Z (S) $3080
1926.451 F03
- Issued
- Mar 10, 2014
- Abate by
- Mar 20, 2014
- Penalty
- Initial $2,200 · Current $770 Reduced
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. a. At the construction site located at Building #3 on Ellington Circle, Columbus, Ohio, the employer did not ensure the scaffold and scaffold components were inspected by a competent person before each work shift exposing employees to a fall hazard.
Recent events (2)
- · I (S) $770
- · Z (S) $2200
1926.451 G04 I
- Issued
- Mar 10, 2014
- Abate by
- Mar 20, 2014
- Penalty
- Initial $2,200 · Current $770 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. a. At the construction site located at Building #3 on Ellington Circle, Columbus, Ohio, employees were performing stucco work on a new three story apartment building from the second level of a five level scaffold without guardrails installed, thereby exposing employees to a fall hazard. b. At the construction site located at Building #3 on Ellington Circle, Columbus, Ohio, an employee was performing stucco work on a new three story apartment building from the third level of a five level scaffold without guardrails installed, thereby exposing employees to a fall hazard.
Recent events (2)
- · I (S) $770
- · Z (S) $2200
More inspections at Flat Wall Systems, LLC
View Flat Wall Systems, LLC's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339545311.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.