On , OSHA opened a fatality or catastrophe safety inspection of PARK GROUP CONSTRUCTION, LLC in 104 FULTON ST., CAMERON, LA 70631 (NAICS 236115). OSHA activity number 339547887.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Park Group Construction, LLC for free Get an email when a new federal OSHA severe-injury report for Park Group Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
104 FULTON ST.
City
CAMERON
State
LA
ZIP
70631
Mailing
326 SETTLERS TRACE BLVD STE B, LAFAYETTE, LA 70508
Inspection type
Fatality or catastrophe (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236115
Employees
11
Ownership type
Private (A)

3 citations on file for this inspection.

1926.451 F06

Serious Gravity 10 1 instance 4 exposed
Issued
Apr 7, 2014
Abate by
Apr 20, 2014
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer than ten (10) feet to exposed and energized power lines.     On or about January 14, 2014; on the south side of the jobsite, the employer allowed employees to erect a vertical aluminum pole of a pump jack scaffold in a manner that could cause the scaffold pole to come closer than ten (10) feet to energized power lines.
Recent events (2)
  • · I (S) $2800
  • · Z (S) $2800

1926.454 B

Serious Gravity 10 1 instance 4 exposed
Issued
Apr 7, 2014
Abate by
Apr 20, 2014
Penalty
Initial $2,800 · Current $0 Reduced
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with erecting scaffold near energized power lines.    On or about January 14, 2014; on the south side of the jobsite, the employer allowed employees to erect a pump jack scaffold pole that came within ten (10) feet of an energized power lines without first being trained to recognize any hazards associated with erecting scaffold near energized power lines.
Recent events (2)
  • · I (S) $0
  • · Z (S) $2800

1904.39 A

Other-than-serious 1 instance 4 exposed
Issued
Apr 7, 2014
Abate by
Apr 20, 2014
Penalty
Initial $2,000 · Current $0 Reduced
29 CFR 1904.39(a): The employer failed to report to OSHA the in-patient hospitalization of three or more employees because of a work-related incident within eight (8) hours of the hospitalization of the employees.    On or about January 14, 2014; the employer failed to report to OSHA a work-related in-patient hospitalization of three (3) or more employees within eight (8) hours of the hospitalization of the employees.
Recent events (2)
  • · I (O) $0
  • · Z (O) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339547887.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.