CAMERON, LA ·
OSHA Inspection: PARK GROUP CONSTRUCTION, LLC
Fatality or catastrophe inspection · Safety discipline
At a glance
On , OSHA opened a fatality or catastrophe safety inspection of PARK GROUP CONSTRUCTION, LLC in 104 FULTON ST., CAMERON, LA 70631 (NAICS 236115). OSHA activity number 339547887.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PARK GROUP CONSTRUCTION, LLC
- Site address
- 104 FULTON ST.
- City
- CAMERON
- State
- LA
- ZIP
- 70631
- Mailing
- 326 SETTLERS TRACE BLVD STE B, LAFAYETTE, LA 70508
What kind of inspection was it?
- Inspection type
- Fatality or catastrophe (M)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 11
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1926.451 F06
- Issued
- Apr 7, 2014
- Abate by
- Apr 20, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer than ten (10) feet to exposed and energized power lines. On or about January 14, 2014; on the south side of the jobsite, the employer allowed employees to erect a vertical aluminum pole of a pump jack scaffold in a manner that could cause the scaffold pole to come closer than ten (10) feet to energized power lines.
Recent events (2)
- · I (S) $2800
- · Z (S) $2800
1926.454 B
- Issued
- Apr 7, 2014
- Abate by
- Apr 20, 2014
- Penalty
- Initial $2,800 · Current $0 Reduced
General-duty citation text
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with erecting scaffold near energized power lines. On or about January 14, 2014; on the south side of the jobsite, the employer allowed employees to erect a pump jack scaffold pole that came within ten (10) feet of an energized power lines without first being trained to recognize any hazards associated with erecting scaffold near energized power lines.
Recent events (2)
- · I (S) $0
- · Z (S) $2800
1904.39 A
- Issued
- Apr 7, 2014
- Abate by
- Apr 20, 2014
- Penalty
- Initial $2,000 · Current $0 Reduced
General-duty citation text
29 CFR 1904.39(a): The employer failed to report to OSHA the in-patient hospitalization of three or more employees because of a work-related incident within eight (8) hours of the hospitalization of the employees. On or about January 14, 2014; the employer failed to report to OSHA a work-related in-patient hospitalization of three (3) or more employees within eight (8) hours of the hospitalization of the employees.
Recent events (2)
- · I (O) $0
- · Z (O) $2000
More inspections in this industry (NAICS 236115)
More inspections in LA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339547887.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.