Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: STEMCO KAISER INCORPORATED

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STEMCO KAISER INCORPORATED in 113 HEMLOCK STREET, ROME, GA 30161 (NAICS 332116). OSHA activity number 339552242.

Watch Stemco Kaiser Incorporated — free Get an email when a new federal OSHA severe-injury report for Stemco Kaiser Incorporated is published. One employer, no account, unsubscribe in one click.
Site address
113 HEMLOCK STREET
City
ROME
State
GA
ZIP
30161
Mailing
113 HEMLOCK STREET, ROME, GA 30161
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332116
Employees
140
Ownership type
A

3 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 10 2 instances 35 exposed
Issued
Abate by
Penalty
Initial $6300.00 · Current $3780.00 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:   a) Press Room, Tool and Die Room - The employer did not ensure employees who are performing setup on Mechanical Power Presses utilized the lock-out/tagout procedures to fully isolate the equipment prior to changing dies.     b) Press Room, Tool and Die Room - The employer did not ensure employees performing lockout/tagout, utilized procedures for the orderly transfer of lockout or tagout devices between off-going and oncoming employees.
Recent events (2)
  • — I (S) $3780
  • — Z (S) $6300

1910.147 C06 I

Serious Gravity 5 1 instance 35 exposed
Issued
Abate by
Penalty
Initial $4500.00 · Current $2700.00 Reduced
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  a) Press Room, Tool and Die Room - The employer did not inspect all energy control procedures at least annually to correct deviations or inadequacies, nor review each authorized employee's responsibilities under the energy control procedures.
Recent events (2)
  • — I (S) $2700
  • — Z (S) $4500

1910.147 C07 IV

Other-than-serious 2 instances 35 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and kept up to date:  a) Throughout facility - The employer did not maintain certified records of training for all authorized and affected employees who had received training on the control of hazardous energy.