ROME, GA —
OSHA Inspection: STEMCO KAISER INCORPORATED
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of STEMCO KAISER INCORPORATED in 113 HEMLOCK STREET, ROME, GA 30161 (NAICS 332116). OSHA activity number 339552242.
Where did this inspection happen?
- Establishment
- STEMCO KAISER INCORPORATED
- Site address
- 113 HEMLOCK STREET
- City
- ROME
- State
- GA
- ZIP
- 30161
- Mailing
- 113 HEMLOCK STREET, ROME, GA 30161
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332116
- Employees
- 140
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 C04 I
- Issued
- Abate by
- Penalty
- Initial $6300.00 · Current $3780.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Press Room, Tool and Die Room - The employer did not ensure employees who are performing setup on Mechanical Power Presses utilized the lock-out/tagout procedures to fully isolate the equipment prior to changing dies. b) Press Room, Tool and Die Room - The employer did not ensure employees performing lockout/tagout, utilized procedures for the orderly transfer of lockout or tagout devices between off-going and oncoming employees.
Recent events (2)
- — I (S) $3780
- — Z (S) $6300
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $4500.00 · Current $2700.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Press Room, Tool and Die Room - The employer did not inspect all energy control procedures at least annually to correct deviations or inadequacies, nor review each authorized employee's responsibilities under the energy control procedures.
Recent events (2)
- — I (S) $2700
- — Z (S) $4500
1910.147 C07 IV
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and kept up to date: a) Throughout facility - The employer did not maintain certified records of training for all authorized and affected employees who had received training on the control of hazardous energy.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 332116)
SPRINGDALE, PA—2026-04-23
TECKLANE MANUFACTURING, INC.
STRATFORD, CT—2026-02-10
BLASE MANUFACTURING COMPANY
MINNEAPOLIS, MN—2026-01-07
110505 - RAO MANUFACTURING COMPANY
PINE CITY, MN—2025-12-02
110353 - M-M MANUFACTURING INC DBA PRODUCT FABRICATORS
RICHARDSVILLE, KY—2025-08-27
68342 - CANNON AUTOMOTIVE SOLUTIONS - BOWLING GREEN INC
More inspections in GA
GREENSBORO, GA—2026-07-16
PURE BEAUTY FARMS, INC.
FOREST PARK, GA—2026-07-16
POLYNT COMPOSITES USA INC.
AUGUSTA, GA—2026-07-16
GF CASTING SOLUTIONS AUGUSTA, LLC
CHAMBLEE, GA—2026-07-16
U.S. DEPARTMENT OF TREASURY
DECATUR, GA—2026-07-15
PALLETS ACQUISITION LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339552242.