OSHA Inspection: NICK LOTT

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NICK LOTT in LOT A, THE TOWNSHIP AT COLONY PARK, RIDGELAND, MS 39157 (NAICS 238130). OSHA activity number 339559965.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Nick Lott for free Get an email when a new federal OSHA severe-injury report for Nick Lott is published. One employer, no account, unsubscribe in one click.
Establishment
NICK LOTT
Site address
LOT A, THE TOWNSHIP AT COLONY PARK
City
RIDGELAND
State
MS
ZIP
39157
Mailing
3127 GREENFIELD ROAD, PEARL, MS 39208
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
6
Ownership type
Private (A)

4 citations on file for this inspection.

1926.451 B02

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 3, 2014
Abate by
Feb 18, 2014
Penalty
Initial $1,700 · Current $1,700
29 CFR 1926.451(b)(2): Except as provided in paragraphs (b)(2)(i) and (b)(2)(ii) of this section, each scaffold platform and walkway shall be at least 18 inches (46 cm) wide.  a) Jobsite - On or about January 23, 2014, employees were working from a pole scaffold that did not have an 18 inch wide platform.
Recent events (1)
  • · Z (S) $1700

1926.451 G04 I

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 3, 2014
Abate by
Feb 18, 2014
Penalty
Initial $1,700 · Current $1,700
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.  a) Jobsite - On or about January 23, 2014, employees were working from a pole scaffold without having midrails and end rails installed.
Recent events (1)
  • · Z (S) $1700

1926.452 A04

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 3, 2014
Abate by
Feb 18, 2014
Penalty
Initial $1,700 · Current $1,700
29 CFR 1926.452(a)(4): Diagonal bracing in both directions shall be installed across the entire outside face of all double- and single-pole scaffolds.   a) Jobsite - On or about January 23, 2014, employees were working from a pole scaffold without having the scaffold legs braced.
Recent events (1)
  • · Z (S) $1700

1926.501 B13

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 3, 2014
Abate by
Feb 18, 2014
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.501(b)(13): "Residential construction." Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system.    a) Jobsite - On or about January 23, 2014, employees were placing plywood sheathing on a high slop roof without using fall protection.
Recent events (1)
  • · Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339559965.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.