OSHA Inspection: RDA CONSTRUCTION CORPORATION

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of RDA CONSTRUCTION CORPORATION in 475 LOND WHARF DRIVE, NEW HAVEN, CT 06511 (NAICS 237990). OSHA activity number 339567539.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch RDA Construction Corporation — free Get an email when a new federal OSHA severe-injury report for RDA Construction Corporation is published. One employer, no account, unsubscribe in one click.
Site address
475 LOND WHARF DRIVE
City
NEW HAVEN
State
CT
ZIP
06511
Mailing
35 NORTH STREET, CANTON, MA 02021
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237990
Employees
15
Ownership type
A

14 citations on file for this inspection.

1926.251 A01

Serious Gravity 5 3 instances 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 4, 2014
Penalty
Initial $1,600 · Current $960 Reduced
29 CFR 1926.251(a)(1): Rigging equipment for material handling shall be inspected prior to use on each shift and as necessary during its use to ensure that it is safe. Defective rigging equipment shall be removed from service.    Jobsite: The 1-½ inch wire rope sling, used to hoist the vibratory hammer was not inspected before each shift and as needed during the shift to ensure its safe use.
Recent events (2)
  • — I (S) $960
  • — Z (S) $1600

1926.251 C04 IV

Serious Gravity 5 3 instances 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 4, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.251(c)(4)(iv): Wire rope shall not be used if, in any length of eight diameters, the total number of visible broken wires exceeds 10 percent of the total number of wires, or if the rope shows other signs of excessive wear, corrosion, or defect.  Jobsite:  The 1-½ inch wire rope sling, showing many broken individual wires within one strand/one rope lay and other significant wear was used to hoist the vibratory hammer.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.605 C02

Serious Gravity 1 1 instance 1 exposed
Issued
Mar 31, 2014
Abate by
Apr 4, 2014
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1926.605(c)(2): The employer did not ensure that the deck or working surface of a barge was maintained in a safe condition.     Barge Jonathan;  The employer did not ensure that deck area of the barge was maintained free from the accumulation of oil and grease that leaked on the power pack of the vibratory hammer, and employees were exposed to the hazards of trips, slips and falls.
Recent events (2)
  • — I (S) $720
  • — Z (S) $1200

1926.1437 H01

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1926.1437(h)(1): Shift Inspection. In addition to meeting the requirements of 29 CFR 1926.1412 for inspecting the crane/derrick, the employer neither inspected the barge, pontoons, vessels or other means of flotation used to support a flotiing crane/derrick or land crane/derrick nor ensured that the means used to secure/attach the equipment to the vessel/flotation device was in proper condition through each shift inspection, including wear, corrosion, loose or missing fasteners, defective welds, and (when applicable) insufficient tension.    Barge Jonathan: The owner did not ensure through a shift inspection on the Barge that the "means/ methods" to secure the equipment to barge was in good and proper working conditions without wear/tear, corrosion and other conditions.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1926.1437 H02 I

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(h)(2)(i): Monthly Inspection. In addition to meeting the requirements of 29 CFR 1926.1412 for inspecting the crane/derrick, the employer neither inspected the barge, pontoon, vessels or other means of flotation used to support a floting crane/derrick or land crane/derrick nor ensured through monthly inspection that the means to secure/attach the equipment to the vessel/flotation device was in proper condition, including inspection for wear, corrosion, and, when applicable, insufficient tension.  Barge Jonathan: The employer did not ensure through a monthly inspection of the barge that the means to attach and secure the crane to the barge was in good and proper working conditions, including wear/tear, corrosion and potential insufficient tension.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1437 H02 IV

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(h)(2)(iv): Monthly Inspection. In addition to meeting the requirements of 29 CFR 1926.1412 for inspecting the crane/derrick, the employer neither inspected the barge, pontoon, vessels or other menas of flotation used to support a floting crane/derrick or land crane/derrick nor ensured throuth conducting a monthly insppection that the vessel/flotation device was watertight based on the condition of the chain lockers, storage, fuel compartments, and hatches.  Barge Jonathan: The employer did not ensure through conducting a monthly inspection that the condition of the chain, lockers, storage, fuel compartments and hatches that the barge was watertight at all times.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1437 H04 I A

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(h)(4)(i)(A): Annual External Vessel/Flotation Device Inspection. In addition to meeting the requirements of 29 CFR 1926.1412 for inspecting crane/derrick, the employer did not ensure that the external portion of the barge, pontoon, vessel or other means of flotation used was inspected annually by a qualified person who has expertise with respect vessel/flotation devices and the annual inspection included the items identified in paragraphs (h)(1 (Shift) and (h)(2) (Monthly) of this section:  Barge Jonathan: The employer did not ensure that an annual inspection was not only performed on the Barge by a qualified person, but also the inspection included the means to tie down and secure the crane to the barge.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1437 H04 I D

Serious Gravity 1 2 instances 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(h)(4)(i)(D): Annual External Vessel/Flotation Device Inspection. In addition to meeting the requirements of 29 CFR 1926.1412 for inspecting crane/derrick, the employer did not ensure that the external portion of the barge, pontoons, vessel or other means of flotation used was inspected annually by a qualified person who has expertise with respect to vessels/flotation devices and that the inspection includes the following items: Four-corner draft readings.  Barge Jonathan: The employer did not ensure that an annual inspection was not only performed on the Barge by a qualified person, but also the inspection included the placement of the draft marking on all four corners of the barge.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1437 H06

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(h)(6): Documentation. The employer did not ensure that the monthly and annual inspections required in paragraphs (h)(2) and (h)(4) of this section were not only documented in accordance with 29 CFR 1926.1412 (e)(3) and (f)(7), respectively, but also all such documents were made available, during the applicable document retention period, to all persons who conduct inspections in accordance with 29 CFR 1926.1412:  Barge Jonathan: The monthly and annual inspections were not documented, and no other documents were made readily avaiable for review.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1437 N01 I

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1926.1437(n)(1)(i): For land cranes/derricks used on barges, pontoons, vessels or other means of flotation, the employer did not ensure that the rated capacity of the equipment (including but not limited to modification of load charts) applicable for use on land was reduced to account for increased loading from list, trim, wave action, and wind.    Barge Jonathan: The owner did not reduce the rated capacity (Load Chart) to account for increased loading from wind and wave action.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1926.1437 N01 II

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(n)(1)(ii): For land cranes/derricks used on barges, pontoons, vessels or other means of flotation, the employer did not ensure that the rated capacity of the equipment (including but not limited to modification of load charts) applicable for use on land was reduced to be applicable to a specified location(s) on the specific barge, pontoons, vessel or other means of flotation that would be used, under the environmental conditions expected and encountered.  Barge Jonathan: The owner did not reduce the rated capacity (Load Chart) to be applicable to a specific location(s) on this specific barge under the environmental conditions expected and encountered.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1437 N05 I

Serious Gravity 5 4 instances 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1926.1437(n)(5)(i): Physical attachment. The crane/derrick was not physically attached to the barge, pontoons, vessel or other means of flotation. Methods of physical attachment include crossed-cable systems attached to the crane/derrick and vessel/flotation device, bolting or welding the crane/derrick to the vessel/flotation device, strapping the crane/derrick to the vessel/flotation device with chains, or other methods of physical attachment.    Barge Jonathan:  The owner did not ensure that the attachment system used to secure the crane to the barge was of sufficient size and strength to prevent shifting, exposing employees to capsize, crushing and struck-by hazards.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1926.1437 N05 V

Serious Gravity 5 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(n)(5)(v): The systems/means of securement of the crane to the barge used to comply with options 1-4 of this section were not designed by a qualified person familiar with floating crane/derrick design.   Barge Jonathan:  The owner did not ensure that the attachment system used to secure the crane to the barge was designed by a marine engineer, registered professional engineer familiar with floating crane/derrick design, or qualified person familiar with floating crane/derrick design, and employees were exposed to capsize, crushing and struck-by hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1437 C02 II

Other-than-serious 1 instance 4 exposed
Issued
Mar 31, 2014
Abate by
Apr 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1437(c)(2)(ii): Clearly mark the hazard areas by a combination of warning signs (such as, "Danger--Swing/Crush Zone") and high visibility markings on the equipment that identify the hazard areas. In addition, the employer must train each employee to understand what these markings signify.  Jobsite: The owner did not ensure that hazard areas were marked with warning signs to protect employees from struck by or crushing hazards due to the rotation of the superstructure and or the counter weights.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View RDA Construction Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339567539.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.