Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,288Inspections Most recent open 2026-07-24 Last loaded 2026-07-29

OSHA Inspection: MONTREAL CONSTRUCTION INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MONTREAL CONSTRUCTION INC in 360 WEST PULTENEY STREET, CORNING, NY 14830 (NAICS 236220). OSHA activity number 339574279.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Montreal Construction INC — free Get an email when a new federal OSHA severe-injury report for Montreal Construction INC is published. One employer, no account, unsubscribe in one click.
Site address
360 WEST PULTENEY STREET
City
CORNING
State
NY
ZIP
14830
Mailing
522 LIBERTY STREET, SYRACUSE, NY 13204
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
200
Ownership type
A

7 citations on file for this inspection.

1926.403 I02 I

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 14, 2014
Abate by
Mar 20, 2014
Penalty
Initial $5,400 · Current $3,240 Reduced
29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraphs (A) through (D) of this paragraph.   a) 360 West Pulteney Street new Topps Store construction site, Left side of wall to be demolished - On or about 4 February, 2014 - Employees were plugging in an exhaust fan to an outlet that was removed from the wall enclosure and had exposed live conductors.
Recent events (2)
  • — I (S) $3240
  • — Z (S) $5400

1926.153 J

Serious Gravity 5 1 instance 7 exposed
Issued
Mar 14, 2014
Penalty
Initial $3,600 · Current $2,160 Reduced
29 CFR 1926.153(j): Container(s) of liquefied petroleum gas (LP-Gas) were stored within building(s)  a) 360 West Pulteney Street - On or about 4 February, 2013 - Employees were working in a building where liquefied petroleum gas (LP-Gas) was stored within the building.
Recent events (2)
  • — I (S) $2160
  • — Z (S) $3600

1926.150 C01 I

Serious Gravity 1 1 instance 7 exposed
Issued
Mar 14, 2014
Abate by
Mar 26, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.150(c)(1)(i): A fire extinguisher, rated not less than 2A, was not provided for each 3,000 square feet of the protected building area, or major fraction thereof:   a) 360 West Pulteney Street, Corning NY - On or about 4 February, 2013 - Employees were working at a job site building area without the protection of fire extinguishers.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 G01 III B

Other-than-serious 1 instance 7 exposed
Issued
Mar 14, 2014
Abate by
Mar 26, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.405(g)(1)(iii)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors:   a) 360 West Pulteney - On or about 4 February, 2014 - Employees were plugging extension cords into electrical boxes that were supplied power through flexible cords that were run through holes in the wall.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1926.405 G02 IV

Other-than-serious 1 instance 1 exposed
Issued
Mar 14, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:  a)  360 West Pulteney Street - On or about 4 February, 2014 - Employees were using an extension that did not have strain relief to prevent pull from being transmitted directly to the joints or terminal screws.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1926.405 B02

Other-than-serious 1 instance 1 exposed
Issued
Mar 14, 2014
Abate by
Mar 26, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.405(b)(2): In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy:   a) 360 West Pulteney Street Rear of building - On or about 4 February, 2014 - Employees were using 120 volt outlet boxes to power equipment that did not have a face plates installed.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1926.403 B01 I

Other-than-serious 2 instances 7 exposed
Issued
Mar 14, 2014
Abate by
Mar 26, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.403(b)(1)(i): Safety of equipment was not determined on the basis of suitability of the equipment for an identified purpose as evidenced by listing, labeling, or certification for that identified purpose.  a) 360 West Pulteney Street Rear of building - On or about 4 February, 2014 - Employees were using a 120 volt 4 gang outlet box to power equipment that was not used in accordance with manufacturers instruction.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339574279.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.