OSHA Inspection: REDEEMER PRESBYTERIAN CHURCH

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of REDEEMER PRESBYTERIAN CHURCH in 903 N ST MARYS, SAN ANTONIO, TX 78209 (NAICS 813110). OSHA activity number 339586117.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Redeemer Presbyterian Church for free Get an email when a new federal OSHA severe-injury report for Redeemer Presbyterian Church is published. One employer, no account, unsubscribe in one click.
Site address
903 N ST MARYS
City
SAN ANTONIO
State
TX
ZIP
78209
Mailing
3737 BROADWAY SUITE 300, SAN ANTONIO, TX 78209
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
813110
Employees
5
Ownership type
Private (A)

3 citations on file for this inspection.

1926.1101 K02 II A

Serious Gravity 10 7 instances 30 exposed
Issued
Jul 7, 2014
Abate by
Jul 29, 2014
Penalty
Initial $2,800 · Current $960 Reduced

Hazardous substances 9020

29 CFR 1926.1101(k)(2)(ii)(A):  Building and/or facility owners failed to notify prospective employers applying for or bidding for work whose employees can reasonably be expected to work in or adjacent to areas containing asbestos containing material or presumed asbestos containing material of the presence, location and quantity:        a)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Kopplow Construction of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and soliciting subcontractors to perform demolition and renovation activities including wall removal throughout the building which was constructed in 1973.           b)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform J.R. Ramon & Sons, Inc. of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for demolition and cutting of concrete masonry unit and concrete walls which contained asbestos containing weatherproofing material.            c)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Texas Cutting & Coring of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for demolition and cutting of concrete masonry unit and concrete walls which contained asbestos containing weatherproofing material.           d)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Beyer Mechanical of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing dry wall install in the gym where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.            e)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Automatic Fire Protection of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing sprinkler system install in the gym where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.         f)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform FAK Painting of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing painting operations in the gym where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.         g)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Cappadonna Electric of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing electrical wiring install in the gym or in the building where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.
Recent events (2)
  • · I (S) $960
  • · Z (S) $2800

1926.1101 K02 II C

Serious Gravity 10 7 instances 30 exposed
Issued
Jul 7, 2014
Abate by
Jul 29, 2014
Penalty
Initial $0 · Current $0

Hazardous substances 9020

29 CFR 1926.1101(k)(2)(ii)(C): The building owner and/or facility owner did not notify all employers of employees who work within or adjacent to the areas containing asbestos containing materials (ACM) and presumed asbestos containing materials of the presence, location and quantity:         a)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Kopplow Construction of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and soliciting subcontractors to perform demolition and renovation activities including wall removal throughout the building which was constructed in 1973.           b)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform J.R. Ramon & Sons, Inc. of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for demolition and cutting of concrete masonry unit and concrete walls which contained asbestos containing weatherproofing material.            c)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Texas Cutting & Coring of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for demolition and cutting of concrete masonry unit and concrete walls which contained asbestos containing weatherproofing material.           d)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Beyer Mechanical of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing dry wall install in the gym where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.            e)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Automatic Fire Protection of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing sprinkler system install in the gym where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.         f)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform FAK Painting of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing painting operations in the gym where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.         g)  The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Cappadonna Electric of the presence, location, and quantity of ACM and/or PACM prior to the employer bidding for work and performing electrical wiring install in the gym or in the building where concrete masonry unit containing asbestos weatherproofing material was cut and removed by employees of J.R. Ramon and Texas Cutting & Coring.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.1101 K08 I

Serious Gravity 5 3 instances 9 exposed
Issued
Jul 7, 2014
Abate by
Jul 29, 2014
Penalty
Initial $2,000 · Current $960 Reduced

Hazardous substances 9020

29 CFR 1926.1101(k)(8)(i): Labels were not affixed to all products containing asbestos and to all containers containing such products, including waste containers:         The YMCA Building 905 N St Marys St San Antonio TX:  On or about January 23, 2014 and at times prior to, Redeemer Presbyterian Church did not inform Kopplow Construction and its subcontractors of the presence or quantity of ACM and/or PACM.  The building owner did not label nor were signs affixed or posted on identified ACM and/or PACM.
Recent events (2)
  • · I (S) $960
  • · Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339586117.