PECOS, TX ·
OSHA Inspection: HELMERICH & PAYNE INTERNATIONAL DRILLING CO.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of HELMERICH & PAYNE INTERNATIONAL DRILLING CO. in WOLFBONE (TREND AREA) FIELD, BETTYLOU LEASE, WELL #2206H, H&P DRILLING RIG #361, 20.9 MILES S. OF PECOS, PECOS, TX 79772 (NAICS 213111). OSHA activity number 339607566.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HELMERICH & PAYNE INTERNATIONAL DRILLING CO.
- Site address
- WOLFBONE (TREND AREA) FIELD, BETTYLOU LEASE, WELL #2206H, H&P DRILLING RIG #361, 20.9 MILES S. OF PECOS
- City
- PECOS
- State
- TX
- ZIP
- 79772
- Mailing
- 7951 E. I-H-20, ODESSA, TX 79765
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 213111
- Employees
- 22
- Ownership type
- Private (A)
Citations
2 citations on file for this inspection.
1910.23 C01
- Issued
- Jul 21, 2014
- Abate by
- Aug 15, 2014
- Penalty
- Initial $3,740 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards: Drill site: On or about February 25, 2014, the walkway (platform) leading from the staircase landing to the rig floor was missing railing. This condition exposed the employees to a fall greater than four feet.
Recent events (2)
- · I (S) $3000
- · Z (S) $3740
1910.305 A02 XI
- Issued
- Jul 21, 2014
- Abate by
- Aug 15, 2014
- Penalty
- Initial $3,740 · Current $2,000 Reduced
General-duty citation text
29 CFR 1910.305(a)(2)(xi): Cable assemblies and flexible cords and cables were not supported in place at intervals that ensure that they will be protected from physical damage: Drill site: on or about February 25, 2014, the 480 volt overhead wires running from the active pit to the premix pit were left hanging low. This condition exposed the electrical conductors to potential physical damage and employees to electrical shock hazards.
Recent events (2)
- · I (O) $2000
- · Z (S) $3740
More inspections at Helmerich & Payne International Drilling CO.
View Helmerich & Payne International Drilling CO.'s full OSHA safety record →
More inspections in this industry (NAICS 213111)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339607566.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.