TUPPER LAKE, NY ·
OSHA Inspection: R&C BECKER CONSTRUCTION LLC
Programmed Related inspection · Safety discipline
At a glance
On , OSHA opened a programmed Related safety inspection of R&C BECKER CONSTRUCTION LLC in 61 LAKE STREET, TUPPER LAKE, NY 12986 (NAICS 238190). OSHA activity number 339615916.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- R&C BECKER CONSTRUCTION LLC
- Site address
- 61 LAKE STREET
- City
- TUPPER LAKE
- State
- NY
- ZIP
- 12986
- Mailing
- 286 PARK STREET, TUPPER LAKE, NY 12986
What kind of inspection was it?
- Inspection type
- Programmed Related (I)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238190
- Employees
- 9
- Ownership type
- Private (A)
Citations
9 citations on file for this inspection.
1926.100 A
- Issued
- Mar 28, 2014
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a) At the jobsite, on or about 2/12/14: Employees were working where truss sections were being "flown" in by crane and were not wearing hard-hats.
Recent events (2)
- · I (S) $960
- · Z (S) $1600
1926.405 J01 I
- Issued
- Mar 28, 2014
- Penalty
- Initial $2,400 · Current $1,440 Reduced
General-duty citation text
29 CFR 1926.405(j)(1)(i): Fixtures, lampholders, lamps, rosettes, or receptacles had live parts normally exposed to employee contact: a) At the jobsite, on or about 2/12/14: Employees were using a circular saw, connected to an extension cord that had a damaged plug end.
Recent events (2)
- · I (S) $1440
- · Z (S) $2400
1926.405 G02 IV
- Issued
- Mar 28, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:(a)(LOCATION)(IDENTIFY SPECIFIC EQUIPMENT AND/OR CONDITIONS)(DESCRIBE HAZARDS WHERE NECESSARY) a) At the jobsite, on or about 2/12/14: Employees were using a circular saw, where the cord was pulled free from the plug. b) At the jobsite, on or about 2/12/14: Employees were using a circular saw, where the extension cord that powered the saw was pulled apart at the cord end and the cord where the circular saw was connected.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.451 F07
- Issued
- Mar 28, 2014
- Abate by
- May 2, 2014
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) At the jobsite, on or about 2/12/14: Employees were using a tubeulear welded frame scaffold, 2 sections high, on screws and wheels, where the upper platform of the scaffold was not fully planked, where the upper platform was not fitted with guardrails and no alternate method of fall protection was provided. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $1680
- · Z (S) $2800
1926.451 B01
- Issued
- Mar 28, 2014
- Abate by
- Apr 12, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) At the jobsite, on or about 2/12/14: Employees were using a tubeulear welded frame scaffold, 2 sections high, on screws and wheels, where the upper platform of the scaffold was not fully planked. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.451 G01
- Issued
- Mar 28, 2014
- Abate by
- Apr 12, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. a) At the jobsite, on or about 2/12/14: Employees were using a tubeulear welded frame scaffold, 2 sections high, on screws and wheels, where the upper platform of the scaffold was not fitted with guardrails and no alternate means of fall protection was provided. b) At the jobsite, on or about 2/12/14: Employees were using a pick scaffold to spot for the crane, approximately 12 feet from the lower level without fall protection. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.454 A
- Issued
- Mar 28, 2014
- Abate by
- May 2, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) At the jobsite, on or about 2/12/14: Employees were using a tubeulear welded frame scaffold, 2 sections high, on screws and wheels, where the upper platform of the scaffold was not fitted with guardrails and no alternate means of fall protection was provided. Abatement certification must be submitted for this item.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.1053 B01
- Issued
- Mar 28, 2014
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder rails length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) At the jobsite, on or about 2/12/14: Employees were using a tubeulear welded frame scaffold, 2 sections high, on screws and wheels, where the upper platform of the scaffold was accessed by an extension ladder and that ladder did not reach at least 3 feet above the upper landing.
Recent events (2)
- · I (S) $1680
- · Z (S) $2800
1926.1060 A
- Issued
- Mar 28, 2014
- Abate by
- May 2, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1060(a): The employer did not provide a training program for each employee using ladders and stairways, as necessary, which would enable each employee to recognize hazards related to ladders and stairways and train each employee in the procedures to be followed to minimize these hazards: a) At the jobsite, on or about 2/12/14: Employees were using a tubeulear welded frame scaffold, 2 sections high, on screws and wheels, where the upper platform of the scaffold was accessed by an extension ladder and that ladder did not reach at least 3 feet above the upper landing, and where those employees were not trained on hazards associated with use of ladders. Abatement certificatioin must be submitted for this item.
Recent events (2)
- · I (S) $0
- · Z (S) $0
More inspections in this industry (NAICS 238190)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339615916.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.