WASHINGTON, DC ·
OSHA Inspection: RICARDO ANTONIO ARGUETA
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of RICARDO ANTONIO ARGUETA in 4421 CHESTNUT LANE, WASHINGTON, DC 20007 (NAICS 236115). OSHA activity number 339634495.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RICARDO ANTONIO ARGUETA
- Site address
- 4421 CHESTNUT LANE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20007
- Mailing
- 848 BERKSHIRE DR, HYATTSVILLE, MD 20783
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 4
- Ownership type
- A
Citations
1 citation on file for this inspection.
1926.501 B13
- Issued
- Apr 17, 2014
- Abate by
- Apr 23, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Top Rear Right Side - Workers preparing to install the third level floor joist were not protected from falling 8' to the inside level or 20' to the outside scrap materials on the ground, on or about 3/5/2014. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- · Z (S) $2800
More inspections in this industry (NAICS 236115)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339634495.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.