OSHA Inspection: STRUCTURE DEVELOPMENT MIDWEST, L.L.C.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of STRUCTURE DEVELOPMENT MIDWEST, L.L.C. in 228 W. ILLINOIS, CHICAGO, IL 60654 (NAICS 236220). OSHA activity number 339646168.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Structure Development Midwest, L.L.C. for free Get an email when a new federal OSHA severe-injury report for Structure Development Midwest, L.L.C. is published. One employer, no account, unsubscribe in one click.
Site address
228 W. ILLINOIS
City
CHICAGO
State
IL
ZIP
60654
Mailing
908 N. HALSTED, CHICAGO, IL 60642
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
10
Ownership type
A

7 citations on file for this inspection.

1926.1101 D03

Serious Gravity 10 1 instance 4 exposed
Issued
Sep 4, 2014
Abate by
Sep 10, 2014
Penalty
Initial $2,800 · Current $7,000

Hazardous substances 9020

29 CFR 1926.1101(d)(3): In addition, all employers of employees exposed to asbestos hazards shall comply with applicable protective provisions to protect their employees. For example, if employees working immediately adjacent to a Class I asbestos job are exposed to asbestos due to the inadequate containment of such job, their employer shall either remove the employees from the area until the enclosure breach is repaired; or perform an initial exposure assessment pursuant to (f) of this section.     a.  On or about March 25, 2014, at the above addressed jobsite, employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities.  The employer failed to protect employees from exposure including, but not limited to when regulated areas were not established, exposure assessments had not been completed, access was not limited and ACM and/or PACM waste was not contained in sealed, labeled bags and disposed of properly.
Recent events (3)
  • · F (S) $7000
  • · C (S) $2800
  • · Z (S) $2800

1926.1101 D05

Serious Gravity 10 1 instance 15 exposed
Issued
Sep 4, 2014
Abate by
Sep 10, 2014
Penalty
Initial $2,800 · Current $7,000

Hazardous substances 9020

29 CFR 1926.1101(d)(5): All general contractors on a construction project which includes work covered by this standard shall be deemed to exercise general supervisory authority over the work covered by this standard, even though the general contractor is not qualified to serve as the asbestos "competent person" as defined by paragraph (b) of this section. As supervisor of the entire project, the general contractor shall ascertain whether the asbestos contractor is in compliance with this standard, and shall require such contractor to come into compliance with this standard when necessary.     a.  On or about March 25, 2014, at the above addressed jobsite, employees and subcontractor employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities.  The employer as general contractor did not ascertain whether the asbestos work conducted was in compliance with the standard and make changes to ensure employees were adequately protected from asbestos exposure.
Recent events (3)
  • · F (S) $7000
  • · C (S) $2800
  • · Z (S) $2800

1926.1101 E02

Serious Gravity 10 1 instance 4 exposed
Issued
Sep 4, 2014
Abate by
Sep 10, 2014
Penalty
Initial $2,800 · Current $7,000

Hazardous substances 9020

29 CFR 1926.1101(e)(2): Demarcation. The regulated area shall be demarcated in any manner that minimizes the number of persons within the area and protects persons outside the area from exposure to airborne asbestos. Where critical barriers or negative pressure enclosures are used, they may demarcate the regulated area. Signs shall be provided and displayed pursuant to the requirements of paragraph (k)(7) of this section.     a.  On or about March 25, 2014, at the above addressed jobsite, employees and subcontractor employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities.  The employer failed to protect employees from exposure to ACM and/or PACM when regulated area(s) were not established nor demarked to notify of health hazard and contain and protect employee(s) from exposure.
Recent events (3)
  • · F (S) $7000
  • · C (S) $2800
  • · Z (S) $2800

1926.1101 E03

Serious Gravity 10 1 instance 4 exposed
Issued
Sep 4, 2014
Abate by
Sep 10, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1101(e)(3): Access. Access to regulated areas shall be limited to authorized persons and to persons authorized by the Act or regulations issued pursuant thereto.    a.  On or about March 25, 2014, at the above addressed jobsite, employees and subcontractor employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities.  The employer failed to protect employees from exposure to ACM and/or PACM when access to area(s) which had ACM and/or PACM debris and waste was not limited.
Recent events (3)
  • · F (S) $0
  • · C (S) $0
  • · Z (S) $0

1926.1101 F02 I

Serious Gravity 10 1 instance 4 exposed
Issued
Sep 4, 2014
Abate by
Sep 10, 2014
Penalty
Initial $2,800 · Current $7,000

Hazardous substances 9020

29 CFR 1926.1101(f)(2)(i): Each employer who has a workplace or work operation covered by this standard shall ensure that a "competent person" conducts an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace. The assessment must be completed in time to comply with requirements which are triggered by exposure data or the lack of a "negative exposure assessment," and to provide information necessary to assure that all control systems planned are appropriate for that operation and will work properly.     a.  On or about March 25, 2014, at the above addressed jobsite, employees and subcontractor employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities.  The employer failed to ensure that a competent person conducted an exposure assessment to determine employee exposure to asbestos.
Recent events (3)
  • · F (S) $7000
  • · C (S) $2800
  • · Z (S) $2800

1926.1101 L02

Serious Gravity 10 1 instance 4 exposed
Issued
Sep 4, 2014
Abate by
Sep 10, 2014
Penalty
Initial $28,000 · Current $7,000 Reduced

Hazardous substances 9020

29 CFR 1926.1101(l)(2): Waste disposal. Asbestos waste, scrap, debris, bags, containers, equipment, and contaminated clothing consigned for disposal shall be collected and disposed of in sealed, labeled, impermeable bags or other closed, labeled, impermeable containers except in roofing operations where the procedures specified in paragraph (g)(8)(ii) of this section apply.    a.  On or about March 25, 2014, at the above addressed jobsite, employees and subcontractor employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities.  The employer failed to collect, dispose of in sealed, labeled, impermeable bags the removed thermal system insulation and other ACM and/or PACM.
Recent events (3)
  • · F (S) $7000
  • · C (W) $28000
  • · Z (W) $28000

1926.1101 L04 II

Serious Gravity 10 1 instance 4 exposed
Issued
Sep 4, 2014
Abate by
Sep 10, 2014
Penalty
Initial $0 · Current $0

Hazardous substances 9020

29 CFR 1926.1101(l)(4)(ii): Waste and debris and accompanying dust in an area containing accessible thermal system insulation or surfacing ACM/PACM or visibly deteriorated ACM shall be promptly cleaned up and disposed of in leak tight containers.    a.  On or about March 25, 2014, at the above addressed jobsite, employees and subcontractor employees were exposed to thermal system insulation containing 10-70% chrysotile asbestos and/or PACM during construction activities.  The employer failed to collect, clean up, dispose of in sealed, labeled, impermeable bags the removed thermal system insulation, visibly damaged thermal insulation and other ACM and/or PACM debris.
Recent events (3)
  • · F (S) $0
  • · C (W) $0
  • · Z (W) $0

View Structure Development Midwest, L.L.C.'s full OSHA safety record →