OSHA Inspection: RIVERSIDE CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RIVERSIDE CONSTRUCTION, LLC in 3209 16TH ST., NE, WASHINGTON, DC 20018 (NAICS 236118). OSHA activity number 339648560.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Riverside Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Riverside Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
3209 16TH ST., NE
City
WASHINGTON
State
DC
ZIP
20018
Mailing
1725 FORREST GLENN DR., PRINCE FREDERICK, MD 20678
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
9
Ownership type
A

10 citations on file for this inspection.

1926.100 A

Serious Gravity 1 1 instance 6 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $1,200 · Current $684 Reduced
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:    a) Employees lifting and working under floor joist being set with no head protection were exposed to struck-by hazards, on or about 03/26/14.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $684
  • — Z (S) $1200

1926.102 A01

Serious Gravity 5 1 instance 5 exposed
Issued
Apr 30, 2014
Penalty
Initial $1,600 · Current $912 Reduced
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:    a) Employees using pneumatic nail guns and circular saws without eye protection were exposed to struck-by hazards, on or about 03/26/14.
Recent events (2)
  • — I (S) $912
  • — Z (S) $1600

1926.403 D01

Serious Gravity 1 2 instances 3 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $1,200 · Current $684 Reduced
29 CFR 1926.403(d)(1): Electric equipment was not firmly secured to the surface on which it was mounted:     a) Employees were using outlets not secured to any surface on the main level creating an electrical hazard, on or about 3/26/14.     b) Employees were using outlets not secured to any surface in the basement creating an electrical hazard, on or about 3/26/14.       Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $684
  • — Z (S) $1200

1926.405 B02

Serious Gravity 1 2 instances 3 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.405(b)(2): In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy:  a) Employees were using an outlet on the main level which did not have a cover creating a fire hazard, on or about 3/26/14.   b) Employees were using outlets in the basement which did not have covers creating a fire hazard, on or about 3/26/14.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 D

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $2,000 · Current $1,140 Reduced
29 CFR 1926.405(d): A panelboard was not dead front.     a) Employees were exposed to electrical hazards due to a breaker panel which did not have a complete dead front, on or about 3/26/14.      Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1140
  • — Z (S) $2000

1926.501 B13

Serious Gravity 10 3 instances 6 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $2,800 · Current $1,596 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):      a) Employees without fall protection on the main level were exposed to an open side creating a fall hazard of approximately 9 feet 7 inches, on or about 3/26/14.     b) Employees setting floor joist without fall protection were exposed to a fall hazard of approximately 15 feet at its highest point, on or about 3/26/14.     c) Employees were exposed to unguarded window openings creating a fall hazard of approximately 7 feet 5 inches, on or about 3/26/14.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1596
  • — Z (S) $2800

1926.503 A01

Serious Gravity 5 1 instance 10 exposed
Issued
Apr 30, 2014
Abate by
Jun 17, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:   a) Employees were exposed to fall hazards without proper training in their recognition, on or about 3/26/14.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1053 B04

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $1,600 · Current $912 Reduced
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed:     a) An employee was using a step ladder in closed position creating a fall hazard, on or about 3/26/14.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $912
  • — Z (S) $1600

1926.1053 B13

Serious Gravity 5 1 instance 4 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step:   a) Employees were working from the top of 6 and 8 foot step ladder to set floor joist creating fall hazards, on or about 3/26/14.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1060 A

Serious Gravity 5 1 instance 10 exposed
Issued
Apr 30, 2014
Abate by
Jun 17, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1060(a): The employer did not provide a training program for each employee using ladders and stairways, as necessary, which would train each employee in the procedures to be followed to minimize hazards related to ladders and stairways:   a) Employees were using ladders improperly creating fall hazards, on or about 3/26/14.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Riverside Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339648560.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.