PITTSBURGH, PA ·
OSHA Inspection: VARNER REMODELING & RESTORATION
Unprogrammed Related inspection · Health discipline
At a glance
On , OSHA opened an unprogrammed Related health inspection of VARNER REMODELING & RESTORATION in 4530 PERRYSVILLE AVENUE, PITTSBURGH, PA 15202 (NAICS 238990). OSHA activity number 339654824.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- VARNER REMODELING & RESTORATION
- Site address
- 4530 PERRYSVILLE AVENUE
- City
- PITTSBURGH
- State
- PA
- ZIP
- 15202
- Mailing
- 262 SPRINGDALE ROAD, VENETIA, PA 15367
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 10
- Ownership type
- Private (A)
Citations
9 citations on file for this inspection.
1926.62 D01 I
- Issued
- May 2, 2014
- Penalty
- Initial $1,200 · Current $720 Reduced
1591
General-duty citation text
29 CFR 1926.62(d)(1)(i): Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 ug/m3) calculated as an 8-hour time-weighted average (TWA): a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - The employer did not initially determine if any employee may be exposed to lead at or above the action level. Employees were dry scraping lead based paint from walls and an initial determination of employee exposures was not made.
Recent events (2)
- · I (S) $720
- · Z (S) $1200
1926.62 D04 I
- Issued
- May 2, 2014
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(d)(4)(i): The employer did not conduct monitoring which was representative of the exposure for each employee in the workplace who was exposed to lead: a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - The employer did not conduct monitoring which was representative of the exposure for each employee in the workplace who was exposed to lead. Employees were dry scraping lead based paint from walls and an initial determination of employee exposures was not made.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.62 D02 V B
- Issued
- May 2, 2014
- Penalty
- Initial $1,200 · Current $720 Reduced
1591
General-duty citation text
29 CFR 1926.62(d)(2)(v)(B): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with appropriate personal protective clothing and equipment in accordance with 29 CFR 1926.62(g): a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - Until the employer performed an acceptable employee exposure assessment, the employer did not provide appropriate personal protective equipment. Employees were dry scraping lead based paint from walls and protective equipment was not made available to employees.
Recent events (2)
- · I (S) $720
- · Z (S) $1200
1926.62 G01 I
- Issued
- May 2, 2014
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(g)(1)(i): The employer did not provide, at no cost to the employee, and ensure that the employee used appropriate protective work clothing and equipment that prevented contamination of the employee and the employee's garments, such as, but not limited to coveralls or similar full-body work clothing: a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - The employer did not provide appropriate personal protective clothing to employees who were dry scraping lead based paint from walls.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.62 D02 V E
- Issued
- May 2, 2014
- Penalty
- Initial $1,200 · Current $720 Reduced
1591
General-duty citation text
29 CFR 1926.62(d)(2)(v)(E): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with biological monitoring in accordance with 1926.62(j)(1)(i), to consist of blood sampling and analysis for lead and zinc protoporphyrin levels: a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - Until the employer performed an acceptable employee exposure assessment, the employer did not provide biological monitoring for employees. Employees were dry scraping lead based paint from walls and biological monitoring was not made available to employees.
Recent events (2)
- · I (S) $720
- · Z (S) $1200
1926.62 J01 I
- Issued
- May 2, 2014
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(j)(1)(i): The employer did not make available initial medical surveillance, consisting of biological monitoring in the form of blood sampling and analysis for lead and zinc protoporphyrin levels, to employees occupationally exposed on any day to lead at or above the action level: a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - Until the employer performed an acceptable employee exposure assessment, the employer did not provide biological monitoring for employees. Employees were dry scraping lead based paint from walls and biological monitoring was not made available to employees.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.62 D02 V F
- Issued
- May 2, 2014
- Penalty
- Initial $1,200 · Current $720 Reduced
1591
General-duty citation text
29 CFR 1926.62(d)(2)(v)(F): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with training in accordance with 29 CFR 1926.21, Safety training and education: a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - Until the employer performed an acceptable employee exposure assessment, the employer did not provide training to employees. Employees were dry scraping lead based paint from walls and training was not made available to employees.
Recent events (2)
- · I (S) $720
- · Z (S) $1200
1926.62 L01 II
- Issued
- May 2, 2014
- Penalty
- Initial $0 · Current $0
1591
General-duty citation text
29 CFR 1926.62(l)(1)(ii): The employer did not train each employee who were subject to exposure to lead at or above the action level on any day, or who were subject to exposure to lead compounds which may cause skin or eye irritation (e.g., lead arsenate, lead azide) in accordance with the requirements of 29 CFR 1926.62 and the employer did not institute a training program and ensure employee participation in the program: a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - The employer did not provide lead training to employees. Employees were dry scraping lead based paint from walls and training was not made available to employees.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.62 F02 I
- Issued
- May 2, 2014
- Penalty
- Initial $1,200 · Current $720 Reduced
1591
General-duty citation text
29 CFR 1926.62(f)(2)(i): The employer did not implement a respiratory protection program in accordance with 29 CFR 1910.134(b) through (d) (except (d)(1)(iii)), and (f) through (m) for each employee required by 29 CFR 1926.62 to use a respirator: a) St. Benedictine Monastery Project, 4530 Perrysville Avenue, on or about February 12, 2014 - The employer did not implement a respiratory protection program and applicable elements for employees who were exposed to lead. Employees were dry scraping lead based paint from walls.
Recent events (2)
- · I (S) $720
- · Z (S) $1200
More inspections in this industry (NAICS 238990)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339654824.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.