OSHA Inspection: PROSPECT WATERPROOFING COMPANY

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of PROSPECT WATERPROOFING COMPANY in 2201 M ST., NW, WASHINGTON, DC 20037 (NAICS 238990). OSHA activity number 339658528.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Prospect Waterproofing Company — free Get an email when a new federal OSHA severe-injury report for Prospect Waterproofing Company is published. One employer, no account, unsubscribe in one click.
Site address
2201 M ST., NW
City
WASHINGTON
State
DC
ZIP
20037
Mailing
118 ACACIA LANE, STERLING, VA 20166
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238990
Employees
150
Ownership type
A

2 citations on file for this inspection.

1926.501 B10

Other-than-serious 1 instance 1 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $4,500 · Current $3,375 Reduced
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system.     a)  Employee applying tar to the roof of the canopy where it meets the building without fall protection, exposing him to an 18 foot fall hazard, on or about 03/31/14.      Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $3375
  • — Z (S) $4500

1926.1053 B01

Other-than-serious 1 instance 1 exposed
Issued
Apr 30, 2014
Abate by
May 6, 2014
Penalty
Initial $3,600 · Current $2,700 Reduced
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access:     a) An employee accessed a canopy roof using an extension ladder which extended approximately 15 inches above the landing exposing the employee to a fall hazard, on or about 03/31/14.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $2700
  • — Z (S) $3600

View Prospect Waterproofing Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339658528.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.