HOUSTON, TX —
OSHA Inspection: NICOLAS ALBARRANS
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of NICOLAS ALBARRANS in 2020 RICHMOND, HOUSTON, TX 77037 (NAICS 238140). OSHA activity number 339665325.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NICOLAS ALBARRANS
- Site address
- 2020 RICHMOND
- City
- HOUSTON
- State
- TX
- ZIP
- 77037
- Mailing
- 326 GULFBANK RD., HOUSTON, TX 77037
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 3
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.50 G
- Issued
- Apr 23, 2014
- Abate by
- Apr 29, 2014
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1926.50(g): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use: a) At the worksite, where an eye wash was not available. Employees were using corrosives such as, but not limited to, Holcim Type S Masonry Cement.
Recent events (1)
- — Z (S) $1200
1926.51 F01
- Issued
- Apr 23, 2014
- Abate by
- Apr 26, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.51(f)(1): The employer did not provide adequate washing facilities for employees engaged in the application of paints, coatings, herbicides, or insecticides, or in other operations where contaminants may be harmful to the employees. Such facilities were not in near proximity to the worksite and was not equipped as to enable employees to remove such substances: a) At the worksite where the employer did not provide washing facilities with non-alkaline soap and hand towels for employees using Holcim Masonry Cement Type S a corrosive containing Portland Cement.
Recent events (1)
- — Z (S) $0
1926.451 E01
- Issued
- Apr 23, 2014
- Abate by
- Apr 25, 2014
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access: a) At the worksite where employees were workiing from a tubular welded scaffolding system that was not provided with ladders or other approved means of accessing platforms. Crossbraces were used as a means of access.
Recent events (1)
- — Z (S) $1600
1926.451 F03
- Issued
- Apr 23, 2014
- Abate by
- Apr 25, 2014
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a) At the worksite where inspections of the scaffolds were not performed by a competent person, in that the designated competent person did not know that tubular welded frame scaffolding over 10 feet in height must be equipped with guard rails on the ends of the frames.
Recent events (1)
- — Z (S) $1600
1926.451 G04 I
- Issued
- Apr 23, 2014
- Abate by
- Apr 25, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: a) At the worksite where a tubular welded scaffolding system had unprotected sides and ends due to the lack of guardrails.
Recent events (1)
- — Z (S) $2800
1926.452 C02
- Issued
- Apr 23, 2014
- Abate by
- Apr 25, 2014
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a) At the worksite where a tubular welded scaffolding system had frames that were not secured by diagonal braces.
Recent events (1)
- — Z (S) $1600
More inspections at Nicolas Albarrans
View Nicolas Albarrans's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339665325.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.