Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: VEGA CONSTRUCTION INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of VEGA CONSTRUCTION INC. in 3623 W. IRVING PARK RD., CHICAGO, IL 60618 (NAICS 238140). OSHA activity number 339674046.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Vega Construction INC. — free Get an email when a new federal OSHA severe-injury report for Vega Construction INC. is published. One employer, no account, unsubscribe in one click.
Site address
3623 W. IRVING PARK RD.
City
CHICAGO
State
IL
ZIP
60618
Mailing
1330 S 61ST CT, CICERO, IL 60804
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

15 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Sep 18, 2014
Abate by
Oct 22, 2014
Penalty
Initial $440 · Current $440
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:    Vega Construction, Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:    Citation Number                              Item Number                                    Abatement Date  01                                                           01a                                                         05/21/2014 01                                                           01b                                                         05/21/2014 01                                                           02a                                                          05/21/2014  01                                                           02b                                                           05/21/2014 01                                                            02c                                                          05/21/2014 01                                                            03a                                                          05/21/2014 01                                                            03b                                                           05/21/2014 01                                                            04a                                                           05/21/2014 01                                                            04b                                                           05/21/2014 01                                                            04c                                                            05/21/2014 01                                                            05a                                                           05/21/2014 01                                                            05b                                                            05/21/2014 01                                                            06a                                                            05/21/2014 01                                                            06b                                                            05/21/2014     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $440

1926.451 D02

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $3,080 · Current $3,080
29 CFR 1926.451(d)(2):  Suspension scaffold outrigger beams were not made of structural metal or equivalent strength material:     a)  Employees were working from a two-point adjustable suspension scaffold supported by outrigger beams, made out of material not specifically designed for this purpose.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $3080

1926.451 D03 VI

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(d)(3)(vi):  Outrigger beams which are not stabilized by bolts or other direct connections to the floor or roof deck were not secured by tiebacks:  a)  Employees were working from a two-point adjustable suspension scaffold supported by outrigger beams which were not secured by tiebacks.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 D03 II

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $3,080 · Current $3,080
29 CFR 1926.451(d)(3)(ii): Sand, gravel and similar materials that can be easily dislocated were used as counterweights:  a)  Bags and buckets filled with sand and gravel were used as counterweights to counterweight two-point adjustable suspension scaffold system.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $3080

1926.451 D03 III

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(d)(3)(iii):  Items that were not specifically designed as counterweights were used to counterweight scaffold systems:     a)  Construction materials not designed to be used as counterweights were used to counterweight two-point adjustable suspension scaffold system.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 D03 IV

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(d)(3)(iv):  Counterweights were not secured by mechanical means to the outrigger beams to prevent accidental displacement:     a)  Employees were working from a two-point adjustable suspension scaffold system with counterweights not secured to the outrigger beams.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 D16

Serious Gravity 5 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $2,200 · Current $2,200
29 CFR 1926.451(d)(16): The suspension scaffold power-operated hoist or manually operated hoist did not have, in addition to the normal operating brake, a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed.   a)  Employees were working from a two-point adjustable suspension scaffold which did not have a breaking device or locking pawl.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2200

1926.451 D17

Serious Gravity 5 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(d)(17):  Manually operated hoists did not have a positive crank force to descend:   a)  Employees were working from a two-point adjustable suspension scaffold where the manually operated hoist did not have a positive crank force to descend.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $0

1926.451 G01 II

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $3,080 · Current $3,080
29 CFR 1926.451(g)(1)(ii): Each employee on a single-point or two-point adjustable suspension scaffold was not protected by both a personal fall arrest system and a guardrail system:  a)  Employees engaged in masonry work were not protected from hazards of falling while working from a two-point adjustable suspension scaffold elevated approximately 20 feet above the ground.        In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $3080

1926.451 G03 I

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(3)(i): Vertical lifelines were not protected from sharp edges and abrasion.  a)  Vertical lifelines that were used by employees working from a two-point adjustable suspension scaffold were not protected from abrasion and sharp edges of the parapet wall.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.502 D01

Serious Gravity 10 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(1): Personal fall arrest system connectors were not drop forged, pressed or formed steel, or made of equivalent materials:    a) Employees were exposed to fall hazards while using personal fall arrest system components containing connectors that were not drop forged, pressed or formed steel.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.454 A

Serious Gravity 5 1 instance 1 exposed
Issued
May 15, 2014
Abate by
Jun 18, 2014
Penalty
Initial $2,200 · Current $2,200
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:  a)  Employer did not provide training to each employee in order to recognize hazards associated with working from two-point adjustable suspension scaffolding and to understand procedures to control or minimize those hazards.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2200

1926.451 F07

Serious Gravity 5 1 instance 1 exposed
Issued
May 15, 2014
Abate by
Jun 18, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7):  Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: Such activities were not performed only by experienced and trained employees selected for such work by the competent person:   a)  Two-point adjustable suspension scaffolding was erected and altered without the supervision and direction of a competent person qualified in scaffold erection.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $0

1926.1053 B01

Serious Gravity 5 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $2,200 · Current $2,200
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access:    a)  An extension ladder used by employees to gain access to a two-point adjustable suspension scaffold platform was not long enough to have its side rails extended at least 3 feet above the platform.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2200

1926.1053 B04

Serious Gravity 5 1 instance 1 exposed
Issued
May 15, 2014
Abate by
May 21, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(4):  Ladder(s) were used for purposes other than the purpose for which they were designed:  a)  Fly section of the extension ladder was used as single ladder to access and egress the working surface.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $0

View Vega Construction INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339674046.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.