GEISMAR, LA ·
OSHA Inspection: PRAXAIR, INC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PRAXAIR, INC in 9154 HIGHWAY 75, GEISMAR, LA 70734 (NAICS 325120). OSHA activity number 339714149.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PRAXAIR, INC
- Site address
- 9154 HIGHWAY 75
- City
- GEISMAR
- State
- LA
- ZIP
- 70734
- Mailing
- 9154 HIGHWAY 75, GEISMAR, LA 70734
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325120
- Employees
- 68
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1910.119 J02
- Issued
- Aug 25, 2014
- Abate by
- Jun 30, 2015
- Penalty
- Initial $5,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment. The employer does not ensure written procedures are established and implemented to maintain the on-going mechanical integrity of the process equipment. A. The violation occurred in the HYCO#1, HYCO#6, and Formaldehyde units on or about April 17, 2014 and at times prior thereto where the employer failed to ensure written procedures were established and implemented for the testing and inspection of process equipment interlocks and controls identified as safe guards and/or safety systems. Identified safe guards and/or safety systems include but not limited to: a. PAH 4602 (Pressure Alarm High) b. ISL 4501/02 (Current Switch Low) c. FSLL 4010 (Flow Switch Low Low) d. TAH (Temperature Alarm High) e. TI-4017 (Temperature Indication) f. PSHH 4033/4076/4076A (Pressure Switch High High) g. LSLL 4204/4212 (Level Switch Low Low) h. TSHH 4412/4405 (Temperature Switch Low Low) i. FISL 4402 (Flow Indication Switch Low) j. PISLL 4023 (Pressure Indication Switch Low Low) k. PDAL 103 (Pressure Differential Alarm Low and Shutdown) B. The violation occurred in the HYCO#1, HYCO#6, and Formaldehyde units on or about April 17, 2014 and at times prior thereto where the employer failed to ensure written procedures were established and implemented for the identification and selection of corrosion/thickness monitoring locations for testing and inspection of process equipment pressure vessels and piping. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure written procedures are established and implemented to maintain the on-going mechanical integrity of the process equipment.
Recent events (2)
- · I (S) $7000
- · Z (S) $5000
1910.119 J04 I
- Issued
- Aug 25, 2014
- Abate by
- Jun 30, 2015
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment. The employer does not ensure that tests and inspections were performed on process equipment to maintain its mechanical integrity. The employer does not ensure that process equipment controls and instruments are inspected and tested to maintain the on-going mechanical integrity of process equipment. The violation occurred in the HYCO#1, HYCO#6, and Formaldehyde units on or about April 17, 2014 and at times prior thereto where the employer failed to ensure testing and inspection was conducted of process equipment interlocks and controls identified as safe guards and/or safety systems. Identified safe guards and/or safety systems include but not limited to: a. PAH 4602 (Pressure Alarm High) b. ISL 4501/02 (Current Switch Low) c. FSLL 4010 (Flow Switch Low Low) d. TAH (Temperature Alarm High) e. TI-4017 (Temperature Indication) f. PSHH 4033/4076/4076A (Pressure Switch High High) g. LSLL 4204/4212 (Level Switch Low Low) h. TSHH 4412/4405 (Temperature Switch Low Low) i. FISL 4402 (Flow Indication Switch Low) j. PISLL 4023 (Pressure Indication Switch Low Low) k. PDAL 103 (Pressure Differential Alarm Low and Shutdown) Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing that it is in compliance with the standard, including describing the steps it is taking to ensure that process equipment controls and instruments are inspected and tested to maintain the on-going mechanical integrity of process equipment.
Recent events (2)
- · I (S) $0
- · Z (S) $7000
1910.119 J04 II
- Issued
- Aug 25, 2014
- Abate by
- Dec 31, 2014
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspections and testing procedures performed on process equipment to maintain its mechanical integrity, did not follow recognized and generally accepted good engineering practices. The employer does not ensure inspections and tests performed to maintain the on-going mechanical integrity of process equipment followed recognized and generally accepted good engineering practices (RAGAGEP). The violation occurred on or about April 17, 2014 and times prior thereto in the HYCO #1 & #6 Units where the employer failed to ensure inspections and testing procedures performed on process equipment piping was in accordance with RAGAGEP such as API 570. Identified process piping included include but are not limited to: a. 3-MEOH-175-J to T-07B (DWG-9311-302-P) b. 1.5"-HCHO-230-P (DWG-9311-303-P) c. RG-5103-10"HSB300C-H-1.5" (7933A250) d. RG-4608-8-C3-C-1½ (7933A400) e. RG-4602-8-C3 (7933A260) f. RG-5106-18-HSB300C-H-3 (7933A225) g. NG-1604-3-K2V10 (7933A510) h. NG-1639-1 1/2-K5V10 (7933A510) i. 8-RG-111-C1-N (1100-SHT-4) j. 6-KEA-154-C1-1VB-2 (1100-SHT-6) k. 4-HY-15-3A1B (1100-SHT-35) l. 6-SG-102A Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure inspections and testing procedures performed to maintain the on-going mechanical integrity of process equipment follow recognized and generally accepted good engineering practices (RAGAGEP).
Recent events (2)
- · I (S) $3500
- · Z (S) $5000
More inspections at Praxair, INC
View Praxair, INC's full OSHA safety record →
More inspections in this industry (NAICS 325120)
More inspections in LA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339714149.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.