OSHA Inspection: SAVAL CONSTRUCTION GROUP

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SAVAL CONSTRUCTION GROUP in 40 WEST 22ND STREET, NEW YORK, NY 10010 (NAICS 238140). OSHA activity number 339745986.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Saval Construction Group — free Get an email when a new federal OSHA severe-injury report for Saval Construction Group is published. One employer, no account, unsubscribe in one click.
Site address
40 WEST 22ND STREET
City
NEW YORK
State
NY
ZIP
10010
Mailing
1261 BROADWAY SUITE 304, NEW YORK, NY 10001
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
1
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 15, 2014
Abate by
Aug 27, 2014
Penalty
Initial $2,800 · Current $2,800
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall and crush hazards.   Site: 40 West 22nd Street New York, NY   On or about 4/24/14   a) Employer replaced the elevator hoist doors without having an engineer or manufacturer approval. The new doors switch did not have safety interlocks on the doors.    AMONG OTHER METHODS, FEASIBLE AND ACCEPTABLE METHODS TO CORRECT THIS HAZARDS IS:   1. Comply with the ASME A17.3-2011 (Safety Code for Existing Elevators and Escalators) Section 1.5, page 17. Alterations, Maintenance, Inspections and Tests.  Existing installations shall conform to the following requirements of ASME A17.1-2004.  (b) Requirements 8.6, Maintenance, Repair and Replacement; and 8.7, Alterations.   2. ASME A17.1-2007/Revision of ASME A17.1-2004 (Safety Code for Elevators and Escalators.  2.12.2.1 General. Each entrance at a landing to an elevator used for passengers or freight and not conforming to 2.12.3.1 shall be equipped with one or more interlocks meeting the design requirements of 2.112.2.4 8.6.12.4 Repairs and Replacement, 8.6.12.4.1 Replacement Parts and Quality of Work and 8.6.12.4.1.1 Replacement Parts and Components.  Unless otherwise required in 8.6.12.5, any repair and replacement of damage or worn parts or components shall be with parts of material and strength equivalent to or better than the original manufacturer's or design. Any change in the design of components other than those specified in 8..12.5 or 8.7, that might affect the safe operation of the equipment shall be certified for use by a professional engineer. A copy of the certification shall be retained by the contractor and recorded in the log book.
Recent events (1)
  • — Z (S) $2800

View Saval Construction Group's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339745986.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.