OSHA Inspection: PND CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PND CONSTRUCTION, LLC in 1342 NORTH CAROLINA AVE., NE, WASHINGTON, DC 20002 (NAICS 236118). OSHA activity number 339746364.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch PND Construction, LLC for free Get an email when a new federal OSHA severe-injury report for PND Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
1342 NORTH CAROLINA AVE., NE
City
WASHINGTON
State
DC
ZIP
20002
Mailing
3515 HARRELL ST., SILVER SPRING, MD 20906
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
3
Ownership type
A

5 citations on file for this inspection.

1926.25 A

Serious Gravity 1 1 instance 1 exposed
Issued
Jul 30, 2014
Abate by
Aug 5, 2014
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures:  a)  First Floor - On or about 04/28/2014, workers were exposed to puncture wounds from nails that had not been removed from refuse lumber which was left in the work area.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1200
  • · Z (S) $1200

1926.451 B01

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Jul 30, 2014
Abate by
Aug 19, 2014
Penalty
Initial $2,400 · Current $0 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)    a)  Back Yard - On or about 04/28/2014, a mason was exposed to 13 foot and a 4 1/2 foot falls from two scaffold platforms which were not fully planked between the scaffold's vertical uprights.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $2400

1926.451 G01

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Jul 30, 2014
Abate by
Aug 19, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:   a)  Back Yard - On or about 04/28/2014, a mason was exposed to a 13 foot fall from the unguarded platform of a supported scaffold.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.451 F03

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 30, 2014
Abate by
Aug 15, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:     a)  Back Yard - On or about 04/28/2014, two deformed (bent) scaffold frames were used in the construction of a tubular welded frame scaffold that were occupied by workers performing masonry work.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.451 F07

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 30, 2014
Abate by
Aug 15, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: Such activities were not performed only by experienced and trained employees selected for such work by the competent person.       a)  Back Yard - On or about 04/24/2014, the site supervisor directed the erection of a fabricated frame scaffold which was not provided with fall protection, whose work platforms were not fully planked and which was constructed with deformed structural components.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

View PND Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339746364.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.