OSHA Inspection: S. HERNANDEZ HOME IMPROVEMENT, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of S. HERNANDEZ HOME IMPROVEMENT, INC. in 2364 WYNSOM AVE., BELLMORE, NY 11710 (NAICS 238140). OSHA activity number 339754384.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch S. Hernandez Home Improvement, INC. for free Get an email when a new federal OSHA severe-injury report for S. Hernandez Home Improvement, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2364 WYNSOM AVE.
City
BELLMORE
State
NY
ZIP
11710
Mailing
45 JACKSON STREET, HEMPSTEAD, NY 11549
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
Private (A)

9 citations on file for this inspection.

1926.95 A

Serious Gravity 1 1 instance 2 exposed
Issued
May 30, 2014
Abate by
Jun 5, 2014
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact.  a) worksite - Employees were applying Master Wall Lumia Finish stucco without eye protection; on or about 05/05/2014.  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (S) $1200

1926.100 A

Serious Gravity 1 1 instance 1 exposed
Issued
May 30, 2014
Abate by
Jun 5, 2014
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  a) worksite - Employees procuring materials for ongoing paver installation directly under ongoing stucco application did not have head protection; on or about 05/05/2014.  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (S) $1200

1926.451 B01

Serious Gravity 5 2 instances 2 exposed
Issued
May 30, 2014
Abate by
Jun 5, 2014
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)  a) worksite - The platform of the fabricated frame scaffold the employee was applying stucco from had approximately 3 planks; on or about 05/05/2014.  b) worksite - The platform of the fabricated frame scaffold the employee was applying stucco from had approximately 2 planks; on or about 05/05/2014.   Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (S) $2000

1926.451 E01

Serious Gravity 5 1 instance 2 exposed
Issued
May 30, 2014
Abate by
Jun 5, 2014
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross braces were used as a means of access.  a) worksite - Employees were climbing the cross braces to access the working level of the scaffold platform approximately 12 feet above the ground; on or about 05/05/2014.  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (S) $1600

1926.451 F06

Serious Gravity 1 1 instance 2 exposed
Issued
May 30, 2014
Abate by
Jun 5, 2014
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6).  a) worksite - Employees were applying stucco from a fabricated frame scaffold that was approximately 4 inches from the approximate 220 volt house service line; on or about 05/05/2014.  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (S) $1200

1926.451 G01 VII

Serious Gravity 5 1 instance 1 exposed
Issued
May 30, 2014
Abate by
Jun 5, 2014
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  Worksite - An employee applying stucco from a fabricated frame scaffold approximately 12 feet above the ground was not protected from falling; on or about 05/05/2014.  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (S) $2000

1910.1200 E01

Other-than-serious 1 instance 2 exposed
Issued
May 30, 2014
Abate by
Jun 18, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59)  a) worksite - Employees were applying Master Wall Lumia Finish Stucco, which contains chemicals such as but not limited to  Acrylic Polymer, Ammonia, and Silica, crystalline quartz to a residential home. The employer did not develop a Hazard Communication Program; On or about 05/05/2014  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (O) $0

1910.1200 G08

Other-than-serious 1 instance 2 exposed
Issued
May 30, 2014
Abate by
Jun 5, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(8):   The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and did not ensure that they were readily accessible during each work  shift to employees when they were in their work area(s)  a) worksite - Employees were applying Master Wall Lumia Finish Stucco, which contains chemicals such as but not limited to Acrylic Polymer, Ammonia, and Silica, crystalline quartz to a residential home. The employer did not ensure the safety data sheets were accessible for the employees; on or about 05/05/2014.  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (O) $0

1910.1200 H01

Other-than-serious 1 instance 2 exposed
Issued
May 30, 2014
Abate by
Jun 18, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)  a) Employees were applying Master Wall Lumia Finish Stucco, which contains chemicals such as but not limited to Acrylic Polymer, Ammonia, and Silica, crystalline quartz to a residential home. The employer did not provide education and training to the employees; on or about 05/05/2012  Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (1)
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339754384.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.