Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,192,068Inspections Most recent open 2026-08-04 Last loaded 2026-08-07

OSHA Inspection: FLINTWOOD METALS, INCORPORATED

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of FLINTWOOD METALS, INCORPORATED in 205 NORTH 5TH AVENUE, LEBANON, PA 17046 (NAICS 332999). OSHA activity number 339756918.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Flintwood Metals, Incorporated for free Get an email when a new federal OSHA severe-injury report for Flintwood Metals, Incorporated is published. One employer, no account, unsubscribe in one click.
Site address
205 NORTH 5TH AVENUE
City
LEBANON
State
PA
ZIP
17046
Mailing
205 NORTH 5TH AVENUE, LEBANON, PA 17046
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332999
Employees
12
Ownership type
A

8 citations on file for this inspection.

1910.110 D07 IV D

Serious Gravity 5 1 instance 12 exposed
Issued
Jun 20, 2014
Penalty
Initial $1,700 · Current $1,275 Reduced
29 CFR 1910.110(d)(7)(iv)(d): Containers were not located so as not to be subject to vehicular damage, or not adequately protected against such damage:  (a)  Flintwood Metals, Incorporated - The two above ground propane storage containers were not guarded against vehicle traffic, on or about May 6, 2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1275
  • · Z (S) $1700

1910.179 J02

Serious Gravity 1 1 instance 5 exposed
Issued
Jun 20, 2014
Abate by
Jul 25, 2014
Penalty
Initial $1,020 · Current $765 Reduced
29 CFR 1910.179(j)(2): The following items were not be inspected for defects at intervals as defined in paragraph (j)(1)(ii) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections:  (a)  Flintwood Metals, Incorporated - The employer did not develop or maintain a frequent inspection program for the four (4) underhung Kone Cranes to ensure the items contained in subparagraphs (i) through (vii) of this section were acceptable, on or about May 6, 2014.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $765
  • · Z (S) $1020

1910.179 J03

Serious Gravity 1 1 instance 5 exposed
Issued
Jun 20, 2014
Abate by
Jul 25, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.179(j)(3): Complete inspections of the crane was not being performed at intervals as generally defined in paragraph (j)(1)(ii)(b) of this section:  (a)  Flintwood Metals, Incorporated - The employer did not develop or implement a periodic inspection program for the four (4) underhung Kone Cranes to ensure that the items contained in subparagraphs (i) through (x) were acceptable, on or about May 6, 2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.303 G02 I

Serious Gravity 5 2 instances 10 exposed
Issued
Jun 20, 2014
Penalty
Initial $1,700 · Current $1,275 Reduced
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating  at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i):  (a)  Flintwood Metals, Incorporated - The 480 volt electrical panel located on the South wall of the Production Area was not provided with a cover, on or about May 6, 2014.  (b)  Flintwood Metals, Incorporated - The garage door control panel located on the East wall of the Production Area was not provided with a cover, on or about May 6, 2014.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1275
  • · Z (S) $1700

1910.1026 D01

Serious Gravity 5 1 instance 1 exposed
Issued
Jun 20, 2014
Abate by
Jul 25, 2014
Penalty
Initial $1,360 · Current $1,020 Reduced

Hazardous substances 0691

29 CFR 1910.1026(d)(1): The employer with a workplace or work operation covered by this standard did not determine the 8-hour time-weighted average exposure for each employee exposed to chromium (VI):  (a) - Flintwood Metals, Incorporated - The employer did not conduct chromium VI employee exposure monitoring for the employee(s) welding on the stainless steel, on or about May 6, 2014.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1020
  • · Z (S) $1360

1910.132 D01

Other-than-serious 1 instance 8 exposed
Issued
Jun 20, 2014
Abate by
Jul 17, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.132(d)(1): The employer did not assess the workplace to determine if hazards were present, or were likely to be present, which necessitated the use of personal protective equipment:  (a) Flintwood Metals, Incorporated - The employer did not conduct a Personal Protective Equipment (PPE) Assessment for the employees welding, painting, and assembling the products, on or about May 6, 2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

1910.1200 E01

Other-than-serious 1 instance 12 exposed
Issued
Jun 20, 2014
Abate by
Jul 25, 2014
Penalty
Initial $0 · Current $0

Hazardous substances 2584

29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:  (a) Flintwood Metals, Incorporated - The employer did not develop or implement a written Hazard Communication Program for the employees exposed to Pro Guard Paint, various cutting lubricants, metal fumes, on or about May 6, 2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

1910.1200 H03 IV

Other-than-serious 1 instance 12 exposed
Issued
Jun 20, 2014
Abate by
Jul 25, 2014
Penalty
Initial $0 · Current $0

Hazardous substances 2584

29 CFR 1910.1200(h)(3)(iv):   The details of the hazard communication program developed by the employer, did not include an explanation of the  safety data sheet, including the order of information and how employee could obtain and use the appropriate hazard information:  (a) Flintwood Metals, Incorporated - The employer did not develop or implement an employee training program which met the requirements of the 2012 Hazard Communication Standard for the employees exposed to Pro Guard Paint, various cutting lubricants, metal fumes, on or about May 6, 2014.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339756918.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.