DUNKIRK, NY —
OSHA Inspection: FIELDBROOK FOODS CORPORATION
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of FIELDBROOK FOODS CORPORATION in ONE ICE CREAM DRIVE, DUNKIRK, NY 14048 (NAICS 311520). OSHA activity number 339762999.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FIELDBROOK FOODS CORPORATION
- Site address
- ONE ICE CREAM DRIVE
- City
- DUNKIRK
- State
- NY
- ZIP
- 14048
- Mailing
- P.O. BOX 1318, DUNKIRK, NY 14048
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 311520
- Employees
- 587
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.119 F01 III C
- Issued
- Nov 6, 2014
- Abate by
- Nov 26, 2014
- Penalty
- Initial $4,250 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.119(f)(1)(iii)(C): Control measures to be taken if physical contact or airborne exposure occurs; a) On or about 5/19/14, the oil drain operating procedures ( vessel in a vacuum, vessel at low pressure, and vessel at high pressure) did not include control measures to be taken if physical contact or airborne exposure occurs during a release of anhydrous ammonia. Control measures could include, but not be limited to, use of an eyewash/shower and evacuation procedures. b) On or about 5/19/14, compressor #22 Vilter high stage operating procedures did not include control measures to be taken if physical contact or airborne exposure occurs during a release of anhydrous ammonia. Control measures could include, but not be limited to, use of an eyewash/shower and evacuation procedures. c) On or about 5/19/14, compressor #24 Vilter high stage operating procedures did not include an control measures to be taken if physical contact or airborne exposure occurs during a release of anhydrous ammonia. Control measures could include, but not be limited to, use of an eyewash/shower and evacuation procedures. ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
- — J (S) $3000
- — C (S) $4250
- — Z (S) $4250
1910.119 D03 II
- Issued
- Nov 6, 2014
- Abate by
- Dec 12, 2014
- Penalty
- Initial $4,250 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(ii) The employer did not document that equipment complies with recognized and generally accepted engineering practices. a) On or about 5/21/14, metal conduit goes through a concrete block wall opening from compressor room 3 to the C.I.P. area. The compressor room wall was not sealed to prevent the escape of anhydrous ammonia vapor per recognized and generally accepted good engineering practices (RAGAGEP) such as, but not limited to, ANSI/ASHRAE Standard 15-2010, Safety Standard for Refrigeration System, Section 8.12c. b) On or about 5/21/14, a PVC pipe goes through a concrete block wall opening from compressor room 3 to the C.I.P area. The compressor room wall was not sealed to prevent the escape of anhydrous ammonia vapor per (RAGAGEP) such as, but not limited to, ANSI/ASHRAE Standard 15-2010, Safety Standard for Refrigeration System, Section 8.12c. c) On or about 5/21/14, conduit from the Fuller A-250 heavy duty safety switch goes through a concrete block wall to the sugar room. The compressor room wall was not sealed to prevent the escape of anhydrous ammonia vapor per (RAGAGEP) such as, but not limited to, ANSI/ASHRAE Standard 15-2010, Safety Standard for Refrigeration System, Section 8.12c. d) On or about 5/21/14, compressor room 3 lacks a door at old compressor room 2. The compressor room wall was not sealed to prevent the escape of anhydrous ammonia vapor per (RAGAGEP) such as, but not limited to, ANSI/ASHRAE Standard 15-2010, Safety Standard for Refrigeration System, Section 8.12b. e) On or about 5/21/14, compressor room 4 lacks a door at old compressor room 2. The compressor room wall was not sealed to prevent the escape of anhydrous ammonia vapor per (RAGAGEP) such as, but not limited to, ANSI/ASHRAE Standard 15-2010, Safety Standard for Refrigeration System, Section 8.12b. f) On or about 5/21/14, old compressor room 2 contains a hot water storage tank and gas-fired boiler. Old compressor room 2 is connected to compressor rooms 3 and 4. There must be no flame-production device or continuously operating hot surface over 800 degrees permanently installed per (RAGAGEP) such as, but not limited to, ANSI/ASHRAE Standard 15-2010, Safety Standard for Refrigeration System, Section 8.12a. ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
- — J (S) $3000
- — C (S) $4250
- — Z (S) $4250
1910.119 D03 III
- Issued
- Nov 6, 2014
- Abate by
- Dec 12, 2014
- Penalty
- Initial $4,250 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(iii) For existing equipment designed and constructed in accordance with codes, standards, or practices that are no longer in general use, the employer did not determine and document that the equipment is designed, maintained, inspected, tested, and operating in a safe manner. a) On or about 5/20/14, the employer did not determine and document that: 1) The Greer #1 receiver (PP-GR1 1,000 pounds of ammonia capacity) and pumps (PP-GR1 pump #1 and PP-GR1 pump #2) located outside a compressor room are designed, maintained, inspected, tested, and operating in a safe manner. Ammonia detectors have not been installed. 2) The Greer #2 receiver (CPR-GR2 750 pounds of ammonia capacity) and accumulator (ACU-GR2 900 pounds of ammonia capacity) located outside a compressor room are designed, maintained, inspected, tested, and operating in a safe manner. Ammonia detectors have not been installed. 3) The Greer #4 receiver (PP-GR4 250 pounds of ammonia capacity) and pumps (PP-GR4 pump #1 and PP-GR4 pump #2 ) located outside a compressor room are designed, maintained, inspected, tested, and operating in a safe manner. Ammonia detectors have not been installed. 4) The Amerio receiver (PP-AM 6,250 pounds of ammonia capacity) and pumps (PP-AM pump #1, PP-AM pump #2, PP-Am pump #3, and PP-AM pump BTC) located outside a compressor room are designed, maintained, inspected, tested, and operating in a safe manner. Ammonia detectors have not been installed. ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
- — J (S) $0
- — C (S) $4250
- — Z (S) $4250
1910.119 E03 IV
- Issued
- Nov 6, 2014
- Abate by
- Dec 12, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(e)(3)(iv): The process hazard analysis did not address: Consequences of failure of engineering and administrative controls: a) On or about 5/20/14, the process hazard analysis did not address: Consequences of failure of engineering and administrative controls of the following equipment: 1) The Greer #1 receiver (PP-GR1 1,000 pounds of ammonia capacity) and pumps (PP-GR1 pump #1 and PP-GR1 pump #2) located outside a compressor room; 2) The Greer #2 receiver (CPR-GR2 750 pounds of ammonia capacity) and accumulator (ACU-GR2 900 pounds of ammonia capacity) located outside a compressor room ; 3) The Greer #4 receiver (PP-GR4 250 pounds of ammonia capacity) and pumps (PP-GR4 pump #1 and PP-GR4 pump #2 ) located outside a compressor room and; 4) The Amerio receiver (PP-AM 6,250 pounds of ammonia capacity) and pumps (PP-AM pump #1, PP-AM pump #2, PP-Am pump #3, and PP-AM pump BTC) located outside a compressor room ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
- — J (S) $0
- — C (S) $0
- — Z (S) $0
1910.303 B02
- Issued
- Nov 6, 2014
- Abate by
- Nov 19, 2014
- Penalty
- Initial $3,400 · Current $0 Reduced
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Compressor room 9 - On or about 5/21/14, a four outlet receptacle box for a damp location was mounted incorrectly with the cover closing up. b) Compressor room 9 - On or about 5/21/14, a four outlet receptacle box was not mounted to a surface. ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
- — J (O) $0
- — C (S) $3400
- — Z (S) $3400
1910.305 G02 III
- Issued
- Nov 6, 2014
- Abate by
- Nov 19, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws a) Compressor room 9 - On or about 5/21/14, a four outlet receptacle box for a damp location had exposed energized conductors where the conductors meet the box fitting. ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
- — J (O) $0
- — C (S) $0
- — Z (S) $0
5(a)(1)
- Issued
- Nov 6, 2014
- Abate by
- Dec 12, 2014
- Penalty
- Initial $10,000 · Current $3,500 Reduced
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to inhalation and burn hazards resulting from an uncontrolled release of anhydrous ammonia. a) Anhydrous ammonia refrigeration system - On or about 5/21/14, the refrigeration system was not adequately maintained to protect employees from an uncontrolled release of anhydrous ammonia in that pressure relief valves (PRVs) were not being inspected or replaced every five years. There was a Cyrus Shank PRV on the oil pot on Greer #1 was scheduled to be replaced in March 2013. (IIAR Bulletin 110, Section 6.6.3) b) Anhydrous ammonia refrigeration system - Compressor room 6 - On or about 5/21/14, the refrigeration system was not adequately maintained to protect employees from an uncontrolled release of anhydrous ammonia in that pressure relief valves (PRVs) were not being inspected or replaced every five years. In addition, a Cyrus Shank PRV on an oil pot on a vertical ammonia tank across from compressor 31 was scheduled to be replaced in October 2013. (IIAR Bulletin 110, Section 6.6.3) ABATEMENT CERTIFICATION REQUIRED The Fieldbrook Farms Corporation was previously cited for a violation of this occupational safety and health standard or its equivalent standard OSH ACT of 1970 Section (5)(a)(1) which was contained in OSHA inspection number 949858, citation number 1, item number 1 and was affirmed as a final order on 6/11/2014, with respect to a workplace located at Gloversville, New York.
Recent events (3)
- — J (S) $3500
- — C (R) $10000
- — Z (R) $10000
1910.303 F01
- Issued
- Nov 6, 2014
- Abate by
- Nov 14, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(f)(1): Each disconnecting means required by Subpart S of Part 1910 for motors and appliances was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: a) Compressor room 3 - The 120 volt main circuit breaker box was not legibly marked. ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
- — J (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at Fieldbrook Foods Corporation
View Fieldbrook Foods Corporation's full OSHA safety record →
More inspections in this industry (NAICS 311520)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339762999.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.