Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,196,249Inspections Most recent open 2026-08-20 Last loaded 2026-08-24

OSHA Inspection: F. C. L. GRAPHICS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of F. C. L. GRAPHICS, INC. in 4600 N OLCOTT AVE, HARWOOD HEIGHTS, IL 60706 (NAICS 323119). OSHA activity number 339778565.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch F. C. L. Graphics, INC. for free Get an email when a new federal OSHA severe-injury report for F. C. L. Graphics, INC. is published. One employer, no account, unsubscribe in one click.
Site address
4600 N OLCOTT AVE
City
HARWOOD HEIGHTS
State
IL
ZIP
60706
Mailing
4600 N OLCOTT AVE, HARWOOD HEIGHTS, IL 60706
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
323119
Employees
180
Ownership type
Private (A)

7 citations on file for this inspection.

1910.147 C04 I

Deleted Serious Gravity 10 8 instances 2 exposed
Issued
Sep 26, 2014
Abate by
Oct 23, 2014
Penalty
Initial $6,300 · Current $0 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  a) Production Areas- The employer failed to develop, document and utilize machine specific procedures to control the potentially hazardous energy on machines, such as Printing Press #2, Printing Press #3, Printing Press #4, Printing Press #5, Printing Press #6, the Pohler Cutters by Heidelberg, the Saber Cutters, and the Imagers.  Without machine specific procedures the employee(s) performing maintenance and serving work were not provided with the proper information on how to secure all sources of energy such as electrical, pneumatic, hydraulic, and gravitational energy.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · F (S) $0
  • · C (S) $6300
  • · Z (S) $6300

1910.147 C06 I

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Sep 26, 2014
Abate by
Oct 23, 2014
Penalty
Initial $4,500 · Current $0 Reduced
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  a) Production Area- The employer failed to conduct periodic inspections of each energy control procedure at least annually to verify the procedures were adequate and were being applied properly.  This would include an inspection of the machine specific procedures for equipment, such as Press #7 and the Wohlenberg Cutter.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · F (S) $0
  • · C (S) $4500
  • · Z (S) $4500

1910.212 A01

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Sep 26, 2014
Abate by
Oct 23, 2014
Penalty
Initial $6,300 · Current $0 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by rotating parts:  a) Printing Area- The employer failed to ensure that all areas where hazards were created by rotating parts were guarded on machinery, such as the rotating shaft in the Contiweb Splicing Area on the Goss Press #5, to prevent injury to employees when the machine is energized.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · F (S) $0
  • · C (S) $6300
  • · Z (S) $6300

1910.305 A02 X

Other-than-serious 3 instances 40 exposed
Issued
Sep 26, 2014
Abate by
Oct 23, 2014
Penalty
Initial $5,400 · Current $1,000 Reduced
29 CFR 1910.305(a)(2)(x): Flexible cords and cables were not protected from accidental damage, as might be caused, for example, by sharp corners, projections, and doorways or other pinch points:    a) Bindery Department- The employer failed to ensure that all flexible cords, such as the cords supplying power to parts of the Bindery Folder #6, Bindery Folder #7, and Bindery Folder #8, were protected from pinch hazards.  These flexible cords were found to be damaged and were run around equipment and on the floor in an arrangement where they could be stepped on, pinched by moving equipment or run over by materials being moved in the area.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · F (O) $1000
  • · C (S) $5400
  • · Z (S) $5400

1910.305 G01 IV A

Deleted Serious Gravity 1 3 instances 7 exposed
Issued
Sep 26, 2014
Abate by
Oct 23, 2014
Penalty
Initial $2,700 · Current $0 Reduced
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  a) Press #5 Area- The employer failed to ensure that flexible cords were not used in lieu of permanent wiring to supply power to permanent structures, such as the fluorescent lighting at the end of Press #5 and the Lakewood Industrial Fan.   b) Sheet Fed #2 Area- The employer failed to ensure that flexible cords were not used in lieu of permanent wiring to supply power to permanent structures, such as the cord running to the cooling system for the dryer and the sump pump, which both service Sheet Fed Machine #2.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · F (S) $0
  • · C (S) $2700
  • · Z (S) $2700

1910.305 G02 II

Deleted Serious Gravity 1 2 instances 35 exposed
Issued
Sep 26, 2014
Abate by
Oct 23, 2014
Penalty
Initial $2,700 · Current $0 Reduced
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap:  a) Bindery Area- The employer failed to ensure that flexible cords, such as the cord for Folder #6 and Folder #8, were used in continuous lengths without a splice.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · F (S) $0
  • · C (S) $2700
  • · Z (S) $2700

1910.334 A03 I

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 26, 2014
Penalty
Initial $2,700 · Current $2,700
29 CFR 1910.334(a)(3)(i): A flexible cord used with grounding type equipment did not contain an equipment grounding conductor:  a) Press #5 Area- The employer failed to ensure that the two-pronged extension cord used to power  the Lakewood Industrial Fan allowed for the use of the fan's grounding pin to be plugged into the circuit.    No abatement certification or documentation is required for this item.
Recent events (3)
  • · F (S) $2700
  • · C (S) $2700
  • · Z (S) $2700

View F. C. L. Graphics, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339778565.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.