SAINT LOUIS, MO ·
OSHA Inspection: SCALLY WATER PROOFING
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SCALLY WATER PROOFING in 1151 KINGSHIGHWAY, SAINT LOUIS, MO 63110 (NAICS 238990). OSHA activity number 339780595.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SCALLY WATER PROOFING
- Site address
- 1151 KINGSHIGHWAY
- City
- SAINT LOUIS
- State
- MO
- ZIP
- 63110
- Mailing
- 7259 DEVONSHIRE, SAINT LOUIS, MO 63119
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 4
- Ownership type
- Private (A)
Citations
2 citations on file for this inspection.
1910.1200 G08
- Issued
- Jun 4, 2014
- Abate by
- Jul 22, 2014
- Penalty
- Initial $1,200 · Current $840 Reduced
General-duty citation text
29 CFR 1910.1200(g)(8): The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and did not ensure that they were readily accessible during each work shift to employees when they were in their work area(s): At the job site, for the employees who were using FIRESTONE EPDM Bonding Adhesive (toluene, acetone) on the roof, the safety data sheet was not present at the site.
Recent events (2)
- · I (S) $840
- · Z (S) $1200
1910.1200 J01
- Issued
- Jun 4, 2014
- Abate by
- Jul 22, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(j)(1): Employer(s) did not train employees regarding the new label elements and safety data sheets format by December 1, 2013: At the job site, for the employees who were using FIRESTONE EPDM Bonding Adhesive (toluene, acetone) on the roof, global harmonization system (GHS) training on the new labeling system and safety data sheet had not been conducted.
Recent events (2)
- · I (S) $0
- · Z (S) $0
More inspections in this industry (NAICS 238990)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339780595.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.