OSHA Inspection: EURO CONSTRUCTION LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EURO CONSTRUCTION LLC in 12 ST AND H ST, NE, WASHINGTON, DC 20010 (NAICS 238140). OSHA activity number 339795940.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Euro Construction LLC — free Get an email when a new federal OSHA severe-injury report for Euro Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
12 ST AND H ST, NE
City
WASHINGTON
State
DC
ZIP
20010
Mailing
13555 POINT PLEASANT DRIVE, CHANTILLY, VA 20151
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
A

4 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 27, 2014
Abate by
Sep 3, 2014
Penalty
Initial $1,600 · Current $800 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):   a)   2nd Level Scaffold Section - Workers were observed installing stone blocks on a wall while working from a scaffold section that was not fully planked on or about May 28, 2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

1926.451 E01

Serious Gravity 5 2 instances 5 exposed
Issued
Aug 27, 2014
Abate by
Sep 3, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross braces were used as a means of access:     a)  Upper and Lower Scaffold Sections - Workers were observed using scaffold members to step up and step down 2 feet 6 inches to and from their working level on a tubular weld scaffold, on or about May 28, 2014.        b)  2nd Level Scaffold Section and Transformer Rooftop - Workers were observed using the scaffold cross braces to climb up and down 3 feet 2 inches to and from the transformer's rooftop on or about May 28, 2014.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 E08

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 27, 2014
Abate by
Sep 3, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(e)(8): Direct access to or from another surface was used when the scaffold was more than 14 inches (36 cm) horizontally and/or 24 inches (61 cm) vertically from the other surface:   a)  Transformer - Worker was observed stepping down 3 feet 2 inches from the rooftop to the scaffold's cross brace on or about May 28, 2014.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G04 I

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 27, 2014
Abate by
Sep 3, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms:   a)  2nd Scaffold Section - Workers were observed installing stone blocks on a wall while working from a tubular weld scaffold section that was missing some of its guardrails, on or about May 28, 2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339795940.