LIBERTY, TX ·
OSHA Inspection: PATTERSON TUBULAR SERVICES
Programmed Related inspection · Safety discipline
At a glance
On , OSHA opened a programmed Related safety inspection of PATTERSON TUBULAR SERVICES in 1100 FM 3361, LIBERTY, TX 77575 (NAICS 331110). OSHA activity number 339839425.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PATTERSON TUBULAR SERVICES
- Site address
- 1100 FM 3361
- City
- LIBERTY
- State
- TX
- ZIP
- 77575
- Mailing
- 539 S. SHELDON RD., CHANNELVIEW, TX 77530
What kind of inspection was it?
- Inspection type
- Programmed Related (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 331110
- Employees
- 20
- Ownership type
- Private (A)
Citations
1 citation on file for this inspection.
1910.147 C04 I
- Issued
- Dec 30, 2014
- Abate by
- Feb 6, 2015
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. The employer does not ensure that its employees utilizes an energy control procedure for the control of potentially hazardous energy when employees are engaged in servicing and/or maintenance of machines or equipment. This violation occurred on or about July 02, 2014 and at times prior thereto, at the facility, where employees were exposed to electrical, caught between and struck-by hazards, when performing service and/or maintenance on the Unit No. 1 without utilizing the energy control procedure. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that specific procedures have been developed, documented and utilized for the control of potentially hazardous energy.
Recent events (2)
- · I (O) $7000
- · Z (S) $7000
More inspections in this industry (NAICS 331110)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339839425.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.