OSHA Inspection: GRADY HUMPHRIES

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GRADY HUMPHRIES in 1324 OAKTON, EVANSTON, IL 60202 (NAICS 238160). OSHA activity number 339850067.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Grady Humphries for free Get an email when a new federal OSHA severe-injury report for Grady Humphries is published. One employer, no account, unsubscribe in one click.
Establishment
GRADY HUMPHRIES
Site address
1324 OAKTON
City
EVANSTON
State
IL
ZIP
60202
Mailing
4612 N. DRAKE, CHICAGO, IL 60625
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
A

10 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Dec 16, 2014
Abate by
Jan 21, 2015
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:     Grady Humphries, dba Hi-Temp Roofing Co., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                              Item Number                                    Abatement Date  01                                                           05                                                   10/31/2014       In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (O) $400

1926.451 C02 I

Serious Gravity 10 2 instances 2 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement:     a) Footings used to support scaffolding erected on a section of flat roof surface were not capable of supporting the loaded scaffold without settling or displacement into the roof surface.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · A (S) $2800
  • · I (S) $1400
  • · Z (S) $2800

1926.451 C03

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement:   a) Supported scaffolding erected on a section of flat roof surface was not plumb and braced to prevent swaying.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · A (S) $0
  • · I (S) $0
  • · Z (S) $0

1926.451 F07

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person:        a) The employer did not ensure that scaffolding provided for employee use at the site was erected under the supervision and direction of a competent person qualified in scaffolding erection.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
  • · A (S) $2000
  • · I (S) $1000
  • · Z (S) $2000

1926.501 B03

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.501(b)(3):  Each employee in a hoist area was not protected from falling 6 feet (1.8 m) or more to lower levels by guardrail systems or personal fall arrest systems:        a) Employees were exposed to the hazard of falling approximately 1 story to the ground while hoisting materials and working in a hoist area at the edge of a roof deck.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · A (S) $2800
  • · I (S) $1600
  • · Z (S) $2800

1926.502 D06 I

Serious Gravity 10 2 instances 2 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.502(d)(6)(i): Snap hooks were engaged directly to webbing, rope or wire rope when not designed for such connections:      a) While working from scaffolding a snaphook used as part of a personal fall arrest system was engaged directly to a lanyard when not designed for such connection.    b) While working from a work platform spanned inside a chimney a snaphook used as part of a personal fall arrest system was engaged directly to a lanyard when not designed for such connection.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · A (S) $2800
  • · I (S) $1400
  • · Z (S) $2800

1926.502 D06 II

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(6)(ii): Snap hooks were engaged directly to each other when not designed for such connections:     a) While working from a work platform spanned inside a chimney a snaphook used as part of a personal fall arrest system was engaged directly to another snaphook when not designed for such connection.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · A (S) $0
  • · I (S) $0
  • · Z (S) $0

1926.502 D16 III

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(16)(iii): Personal fall arrest systems, when stopping a fall, were not rigged such that an employee could not free fall more than 6 feet (1.8 m) nor contact any lower level:  a) While working from a work platform spanned inside a chimney a personal fall arrest system was not rigged such that an employee could not free fall more than 6 feet (1.8 m) nor contact any lower level:   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
  • · A (S) $0
  • · I (S) $0
  • · Z (S) $0

1926.503 A01

Serious Gravity 5 3 instances 3 exposed
Issued
Aug 14, 2014
Abate by
Oct 31, 2014
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:    a) The employer did not provide training to enable employees to recognize the hazards of falling and the procedures to be followed to eliminate or control such hazards at the worksite.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
  • · A (S) $2000
  • · I (S) $1000
  • · Z (S) $2000

1926.552 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 14, 2014
Abate by
Aug 20, 2014
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.552(a)(1): The employer did not comply with the manufacturer's specifications and limitations applicable to the operation of all hoists and elevators. Where manufacturer's specifications are not available, the limitations assigned to the equipment were not based on the determinations of a professional engineer competent in the field:     a) A manually operated material handling host at the roof edge was counterweighted with miscellaneous roofing materials and a propane tank, and not with approved counterweights.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
  • · A (S) $2000
  • · I (S) $1000
  • · Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339850067.