NEW ORLEANS, LA —
OSHA Inspection: RESTEEL SUPPLY CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of RESTEEL SUPPLY CORPORATION in 2001 ST. FERDINAND ST., NEW ORLEANS, LA 70177 (NAICS 332312). OSHA activity number 339850398.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RESTEEL SUPPLY CORPORATION
- Site address
- 2001 ST. FERDINAND ST.
- City
- NEW ORLEANS
- State
- LA
- ZIP
- 70177
- Mailing
- 2001 ST. FERDINAND ST., NEW ORLEANS, LA 70177
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332312
- Employees
- 15
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.212 A05
- Issued
- Jul 29, 2014
- Abate by
- Aug 11, 2014
- Penalty
- Initial $2,800 · Current $700 Reduced
General-duty citation text
29 CFR 1910.212(a)(5): Fan blade guard(s) were not provided where the periphery of the blades was less than seven feet from the floor or working level: On or about May 15, 2014, at the center of the jobsite, the employer allowed employees to utilize three (3) fans (blowers), in order to stay cool, which were not guarded.
Recent events (2)
- — I (S) $700
- — Z (S) $2800
1910.303 B07 IV
- Issued
- Jul 29, 2014
- Abate by
- Aug 11, 2014
- Penalty
- Initial $1,600 · Current $400 Reduced
General-duty citation text
29 CFR 1910.303(b)(7)(iv): There were damaged parts that may adversely affect safe operation or mechanical strength of electric equipment, such as parts that were broken, bent, cut or deteriorated by corrosion, chemical action, or overheating: On or about May 15, 2014, at the center of the jobsite, the employer allowed employees to utilize a rebar bender (Arnold Bender), which had a broken on/off switch box.
Recent events (2)
- — I (S) $400
- — Z (S) $1600
1910.305 G02 II
- Issued
- Jul 29, 2014
- Abate by
- Aug 11, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap: On or about May 15, 2014, at the center of the jobsite, the employer allowed employees to utilize three (3) fans (blowers), in order to stay cool, which had cords that were not adequately spliced.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Resteel Supply Corporation
View Resteel Supply Corporation's full OSHA safety record →
More inspections in this industry (NAICS 332312)
More inspections in LA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339850398.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.