OSHA Inspection: M&M WELL SERVICE LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of M&M WELL SERVICE LLC in AMBER RENEE 25-36H SEC. 25 T154N R91W, STANLEY, ND 58784 (NAICS 213112). OSHA activity number 339853582.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch M&M Well Service LLC — free Get an email when a new federal OSHA severe-injury report for M&M Well Service LLC is published. One employer, no account, unsubscribe in one click.
Site address
AMBER RENEE 25-36H SEC. 25 T154N R91W
City
STANLEY
State
ND
ZIP
58784
Mailing
P.O. BOX 830, RIVERTON, WY 82501
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
213112
Employees
50
Ownership type
A

2 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 2 instances 1 exposed
Issued
Nov 3, 2014
Abate by
Nov 6, 2014
Penalty
Initial $4,900 · Current $2,450 Reduced
Section 5(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall hazards:     (a) On or about July 12, 2014, and at times prior to this date, for employees exposed to an approximate 55-foot fall hazard while working from the tubing board during tripping out operation where the employer had installed a Geronimo emergency escape device anchor approximately 80 feet from the well bore at Amber Renee 25-36H, Sec. 25 T154N R91W, Stanley, ND.        (b) On or about July 12, 2014, and at times prior to this date, for employees exposed to an approximate 55-foot fall hazard while working from the tubing board during tripping out operation where the employer had installed a Geronimo emergency escape device cable with one cable clamp on the ground anchor at Amber Renee 25-36H, Sec. 25 T154N R91W, Stanley, ND.         Abatement Note: Among other methods, one feasible and acceptable means of abatement to correct the hazards would be for the employer to correctly install the Geronimo emergency escape device cable length out to a minimum distance of twice the height of the work platform and to ensure the correct cable clamp orientation of at least three API approved cable clamps in accordance with the Manufacturer's Operators Manual, pages 11 - 13, INSTALLATION, Illustration 3 and 4. Also the (API) American Petroleum Institute Recommended Practice 54, Third Edition (Recommended Practice for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations), section 6.10, AUXILIARY ESCAPE, subsection 6.10.1a, "It is recommended that the ground anchor point of the escape line should be located a minimum lateral distance from the derrick or mast equal to two times the height of the work platform."
Recent events (2)
  • — I (S) $2450
  • — Z (S) $4900

5(a)(1)

Serious Gravity 10 1 instance 3 exposed
Issued
Nov 3, 2014
Abate by
Nov 6, 2014
Penalty
Initial $4,900 · Current $2,450 Reduced
Section 5(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck-by hazards:     (a) On or about July 12, 2014, and at times prior to this date, for employees exposed to a stuck-by hazard while utilizing the rig platform stairway where a high-pressurized Kelly hose was not secured at Amber Renee 25-36H, Sec. 25 T154N R91W, Stanley, ND.        Abatement Note: Among other methods, one feasible and acceptable means of abatement to correct the hazard would be for the employer to ensure flexible high-pressure hoses are secured by an acceptable means in order to maintain control of the hoses in case of a failure in accordance with (API) American Petroleum Institute Recommended Practice 54, Third Edition (Recommended Practice for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations), section 9.13, PRESSURE EQUIPMENT, subsection 9.13.3.
Recent events (2)
  • — I (S) $2450
  • — Z (S) $4900

View M&M Well Service LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339853582.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.