OSHA Inspection: ALL PHASE DRYWALL, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ALL PHASE DRYWALL, INC. in 1625 14TH. ST., NW, WASHINGTON, DC 20009 (NAICS 238310). OSHA activity number 339862302.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ALL Phase Drywall, INC. — free Get an email when a new federal OSHA severe-injury report for ALL Phase Drywall, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1625 14TH. ST., NW
City
WASHINGTON
State
DC
ZIP
20009
Mailing
10665 STAHAVEN PL., SUITE 106A, WHITE PLAINS, MD 20695
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
10
Ownership type
A

7 citations on file for this inspection.

1926.302 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 30, 2014
Abate by
Oct 18, 2014
Penalty
Initial $2,800 · Current $1,400 Reduced
29 CFR 1926.302(e)(1): Powder actuated tool(s) were operated by employee(s) who had not been trained in the operation of the particular tool(s) in use:   a)  Roof, Elevator Control Room - On or about 07/21/2014, a drywall mechanic was operating a Ramset powder-actuated tool while constructing a steel stud framed wall and had not been properly trained in the operation of the particular tool.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.302 E05

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 30, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.302(e)(5): Tools (loaded or empty) were pointed at an employee:  a)  Roof, Elevator Control Room - On or about 07/21/2014, a drywall mechanic was operating a Ramset powder-actuated tool fired the loaded tool in his own direction while installing while a steel stud framed wall .
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.302 E12

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 30, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.302(e)(12): Powder-actuated tools used by employees shall meet all other applicable requirements of American National Standards Institute, A10.3-1970, Safety Requirements for Explosive-Actuated Fastening Tools:  a)  Roof, Elevator Control Room - On or about 07/21/2014, a drywall mechanic was operating a Ramset powder-actuated tool while constructing a steel stud framed wall left the tool unattended in the work area while at lunch in violation of American National Standards Institute, A10.3-1970, Safety Requirements for Explosive Actuated Fastening Tools,  A10.3.6.7.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 B01

Deleted Serious Gravity 1 1 instance 1 exposed
Issued
Sep 30, 2014
Abate by
Oct 18, 2014
Penalty
Initial $2,100 · Current $0 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):   a)  Roof, Elevator Control Room - On or about 07/17/2014, a drywall mechanic was working from the platform of a welded metal frame scaffold whose platform was not fully planked.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement
Recent events (2)
  • — I (S) $0
  • — Z (S) $2100

1926.501 B01

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Sep 30, 2014
Abate by
Oct 18, 2014
Penalty
Initial $3,500 · Current $0 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:   a)  Roof, Elevator Control Room - On or about 07/17/2014, drywall mechanics were exposed to a 60 foot fall from the unprotected edge of a flat roof while accessing a ladder used to reach their work area.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3500

1926.1053 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 30, 2014
Penalty
Initial $2,800 · Current $1,400 Reduced
29 CFR 1926.1053(b)(1):  Where (a) portable ladder(s) was/were used for access to an upper level landing surface and the ladder's length did not allow the ladder side rails to extend at least 3 feet (0.9 m) above the upper landing surface being accessed, the ladder was not secured at its top to a rigid support that will not deflect, and/or a grasping device was not provided to assist employees in mounting and dismounting the ladder:    a)  Roof, Elevator Control Room -  On or about 07/21/2014, drywall mechanics were exposed to a 10 foot fall from a 10 foot portable step ladder which did not extend three feet above the ladder landing and which was not secured in place and provided with a grab rail.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.1053 B04

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 30, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed:   a)  Roof - Elevator Control Room - On or about 07/21/2014, drywall mechanics were exposed to a 10 foot fall while climbing a 10 foot fiberglass portable step ladder which was left folded together and leaned up against a wall while in use.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View ALL Phase Drywall, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339862302.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.