WASHINGTON, DC —
OSHA Inspection: OSCAR CONSTRUCTION
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of OSCAR CONSTRUCTION in 2840 BELAIR PL., NE, WASHINGTON, DC 20018 (NAICS 238130). OSHA activity number 339864555.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- OSCAR CONSTRUCTION
- Site address
- 2840 BELAIR PL., NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20018
- Mailing
- 7716 LAKE DR., MANASSAS, VA 20111
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 8
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.95 A
- Issued
- Aug 20, 2014
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition wherever it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact: a) Employees were using pneumatic nail guns and circular saws without eye protection exposing them to struck-by hazards, on or about 07/23/14. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2000
1926.451 G01 VII
- Issued
- Aug 20, 2014
- Abate by
- Aug 26, 2014
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a) Employees from a pump jack scaffold were exposed to fall hazards approximately 18 feet, on or about 07/23/14. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- — Z (S) $2800
1926.452 J02
- Issued
- Aug 20, 2014
- Abate by
- Aug 26, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary: a) Employees working from a pump jack scaffold which was not secured at the bottom were exposed to an approximate 18 foot fall, on or about 07/23/14. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- — Z (S) $0
1926.501 B13
- Issued
- Aug 20, 2014
- Abate by
- Aug 26, 2014
- Penalty
- Initial $2,400 · Current $2,400
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Employees were exposed to fall hazards of 6 feet 8 inches from wall openings on the east side where windows were to be installed, on or about 07/23/14. b) Employees were exposed to a fall hazard of 10 feet from an open floor hole on the east side, on or about 07/23/14. c) Employees were exposed to a fall hazard of 10 feet 4 inches from a wall opening on the west side, on or about 07/23/14. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2400
1926.1053 A02
- Issued
- Aug 20, 2014
- Abate by
- Aug 26, 2014
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.1053(a)(2): Ladder rungs, cleats, and/or steps were not parallel, level, and uniformly spaced when the ladder was in position for use: a) Employees would use a job made ladder which did not have uniformly spaced rungs, on or about 07/23/14. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1600
1926.405 B02
- Issued
- Aug 20, 2014
- Abate by
- Aug 26, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(b)(2): In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy: a) Employees were using a quad outlet box, which housed the GFCI outlets, with no cover exposing them to fire hazards, on or about 07/23/14. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (O) $0
1926.416 E01
- Issued
- Aug 20, 2014
- Abate by
- Aug 26, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used: a) Employees were using an extension cord which had damage to the sheathing, on or about 07/23/14.
Recent events (1)
- — Z (O) $0
1926.1053 B20
- Issued
- Aug 20, 2014
- Abate by
- Aug 26, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(20): Employees did not face the ladder when ascending or descending the ladder: a) An employee was installing windows and ascending the ladder while not facing the ladder, on or about 07/23/14.
Recent events (1)
- — Z (O) $0
More inspections at Oscar Construction
View Oscar Construction's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339864555.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.