Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: SYSCO ALBANY, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SYSCO ALBANY, LLC in 1 LIEBICH LANE, CLIFTON PARK, NY 12065 (NAICS 424490). OSHA activity number 339864969.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Sysco Albany, LLC for free Get an email when a new federal OSHA severe-injury report for Sysco Albany, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
SYSCO ALBANY, LLC
Site address
1 LIEBICH LANE
City
CLIFTON PARK
State
NY
ZIP
12065
Mailing
1 LIEBICH LANE, CLIFTON PARK, NY 12065
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
424490
Employees
420
Ownership type
A

8 citations on file for this inspection.

1910.119 D02 I D

Serious Gravity 5 1 instance 100 exposed
Issued
Jan 20, 2015
Abate by
Feb 20, 2015
Penalty
Initial $5,000 · Current $5,000
29 CFR 1910.119(d)(2)(i)(D): Information concerning the technology of the process did not include safe upper and lower limits for such items as temperatures, pressures, flows or compositions:  (a) Anhydrous ammonia refrigeration process:   On or prior to 7/24/14, process safety information pertaining to operation of the low temperature recirculator did not include safe upper and lower limits for pressure and temperature which reflected actual conditions of operation, in that:  the vessel was operated at -25F, which is below the specified Minimum Design Metal Temperature (MDMT) of -20F.
Recent events (3)
  • · F (S) $5000
  • · C (S) $5000
  • · Z (S) $5000

1910.119 D03 I E

Other-than-serious 1 instance 100 exposed
Issued
Jan 20, 2015
Penalty
Initial $4,250 · Current $4,250
29 CFR 1910.119(d)(3)(i)(E):  Information pertaining to the equipment in the process did not include ventilation system design.    (a)  Anhydrous Ammonia Refrigeration System:  On or prior to 7/24/14, ventilation design specifications maintained in process safety information were not accurate in that Minimum Ventilation Worksheet calculations maintained in Process Safety Information did not utilize the correct specifications for installed ventilation fans.
Recent events (3)
  • · F (O) $4250
  • · C (S) $4250
  • · Z (S) $4250

1910.119 D03 II

Other-than-serious 1 instance 100 exposed
Issued
Jan 20, 2015
Abate by
Feb 20, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices:    Machine room:  On or prior to 7/24/14, the low temperature recirculator was operated at a temperature of -25F, which is below the Minimum Design Metal Temperature (MDMT) of vessel (-20F) stamped on the ASME data plate.  The employer did not document that the vessel was designed for this service.
Recent events (3)
  • · F (O) $0
  • · C (S) $0
  • · Z (S) $0

1910.119 E03 I

Serious Gravity 5 1 instance 100 exposed
Issued
Jan 20, 2015
Abate by
Feb 20, 2015
Penalty
Initial $5,000 · Current $5,000
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address the hazards of the process.  (a)  Anhydrous ammonia refrigeration system:  On or prior to 7/24/14, the Process Hazard Analysis did not address hazard(s) associated with inbounding ammonia, including but not limited to hazards associated with contamination or use of ammonia which is not refrigerant grade.  (b)  Anhydrous ammonia refrigeration system:  On or prior to 7/24/14, the Process Hazard Analysis did not address hazard(s) associated with operating the low temperature recirculator below the Minimum Design Metal Temperature for the vessel; vessel was operated at -25F which is below the specified MDMT of -20F.
Recent events (3)
  • · F (S) $5000
  • · C (S) $5000
  • · Z (S) $5000

1910.119 E03 VII

Serious Gravity 5 1 instance 120 exposed
Issued
Jan 20, 2015
Abate by
Feb 20, 2015
Penalty
Initial $5,000 · Current $5,000
29 CFR 1910.119(e)(3)(vii): The process hazard analysis did not address a qualitative evaluation of a range of the possible safety and health effects of failure of controls on employees in the workplace:  (a) Anhydrous ammonia refrigeration system:  On or prior to 7/24/14, the 2005 Process Hazard Analysis and subsequent revalidation(s) did not include a qualitative evaluation of a range of the possible safety and health effects of failure of controls on employees in the workplace, in that the PHA did not utilize a risk matrix, risk assessment, or other recognized qualitative method to evaluate the impact to employees posed by each identified hazard.
Recent events (3)
  • · F (S) $5000
  • · C (S) $5000
  • · Z (S) $5000

1910.119 J05

Other-than-serious 1 instance 100 exposed
Issued
Jan 20, 2015
Abate by
Feb 20, 2015
Penalty
Initial $5,000 · Current $5,000
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) before use:    (a) Roof of machine room, near condenser unit(s):  On or prior to 7/24/14, HSD (high pressure vapor) and CD (high pressure liquid) ammonia lines showed evidence of paint coating failure and corrosion.
Recent events (3)
  • · F (O) $5000
  • · C (S) $5000
  • · Z (S) $5000

1910.119 L01

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Jan 20, 2015
Abate by
Feb 20, 2015
Penalty
Initial $5,000 · Current $0 Reduced
29 CFR 1910.119(l)(1): The employer did not implement procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process:  (a) Machine room, anhydrous ammonia refrigeration process:  On or prior to 7/24/14, management of change (MOC) procedures were not implemented to reflect process changes associated with installation of a continuous ventilation fan in the machine room.
Recent events (3)
  • · F (S) $0
  • · C (S) $5000
  • · Z (S) $5000

1910.119 L04

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Jan 20, 2015
Abate by
Feb 20, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.119(l)(4): If a change covered by this paragraph results in a change in the process safety information required by paragraph (d) of this section, such information shall be updated accordingly:   (a) Machine room, Anhydrous Ammonia Refrigeration process:  On or prior to 7/24/14, Process Safety Information (minimum ventilation worksheets) were not updated to reflect installation of a continuous ventilation fan.
Recent events (3)
  • · F (S) $0
  • · C (S) $0
  • · Z (S) $0

View Sysco Albany, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339864969.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.