CLIFTON PARK, NY ·
OSHA Inspection: SYSCO ALBANY, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SYSCO ALBANY, LLC in 1 LIEBICH LANE, CLIFTON PARK, NY 12065 (NAICS 424490). OSHA activity number 339864969.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SYSCO ALBANY, LLC
- Site address
- 1 LIEBICH LANE
- City
- CLIFTON PARK
- State
- NY
- ZIP
- 12065
- Mailing
- 1 LIEBICH LANE, CLIFTON PARK, NY 12065
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 424490
- Employees
- 420
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.119 D02 I D
- Issued
- Jan 20, 2015
- Abate by
- Feb 20, 2015
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(d)(2)(i)(D): Information concerning the technology of the process did not include safe upper and lower limits for such items as temperatures, pressures, flows or compositions: (a) Anhydrous ammonia refrigeration process: On or prior to 7/24/14, process safety information pertaining to operation of the low temperature recirculator did not include safe upper and lower limits for pressure and temperature which reflected actual conditions of operation, in that: the vessel was operated at -25F, which is below the specified Minimum Design Metal Temperature (MDMT) of -20F.
Recent events (3)
- · F (S) $5000
- · C (S) $5000
- · Z (S) $5000
1910.119 D03 I E
- Issued
- Jan 20, 2015
- Penalty
- Initial $4,250 · Current $4,250
General-duty citation text
29 CFR 1910.119(d)(3)(i)(E): Information pertaining to the equipment in the process did not include ventilation system design. (a) Anhydrous Ammonia Refrigeration System: On or prior to 7/24/14, ventilation design specifications maintained in process safety information were not accurate in that Minimum Ventilation Worksheet calculations maintained in Process Safety Information did not utilize the correct specifications for installed ventilation fans.
Recent events (3)
- · F (O) $4250
- · C (S) $4250
- · Z (S) $4250
1910.119 D03 II
- Issued
- Jan 20, 2015
- Abate by
- Feb 20, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices: Machine room: On or prior to 7/24/14, the low temperature recirculator was operated at a temperature of -25F, which is below the Minimum Design Metal Temperature (MDMT) of vessel (-20F) stamped on the ASME data plate. The employer did not document that the vessel was designed for this service.
Recent events (3)
- · F (O) $0
- · C (S) $0
- · Z (S) $0
1910.119 E03 I
- Issued
- Jan 20, 2015
- Abate by
- Feb 20, 2015
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address the hazards of the process. (a) Anhydrous ammonia refrigeration system: On or prior to 7/24/14, the Process Hazard Analysis did not address hazard(s) associated with inbounding ammonia, including but not limited to hazards associated with contamination or use of ammonia which is not refrigerant grade. (b) Anhydrous ammonia refrigeration system: On or prior to 7/24/14, the Process Hazard Analysis did not address hazard(s) associated with operating the low temperature recirculator below the Minimum Design Metal Temperature for the vessel; vessel was operated at -25F which is below the specified MDMT of -20F.
Recent events (3)
- · F (S) $5000
- · C (S) $5000
- · Z (S) $5000
1910.119 E03 VII
- Issued
- Jan 20, 2015
- Abate by
- Feb 20, 2015
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(e)(3)(vii): The process hazard analysis did not address a qualitative evaluation of a range of the possible safety and health effects of failure of controls on employees in the workplace: (a) Anhydrous ammonia refrigeration system: On or prior to 7/24/14, the 2005 Process Hazard Analysis and subsequent revalidation(s) did not include a qualitative evaluation of a range of the possible safety and health effects of failure of controls on employees in the workplace, in that the PHA did not utilize a risk matrix, risk assessment, or other recognized qualitative method to evaluate the impact to employees posed by each identified hazard.
Recent events (3)
- · F (S) $5000
- · C (S) $5000
- · Z (S) $5000
1910.119 J05
- Issued
- Jan 20, 2015
- Abate by
- Feb 20, 2015
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) before use: (a) Roof of machine room, near condenser unit(s): On or prior to 7/24/14, HSD (high pressure vapor) and CD (high pressure liquid) ammonia lines showed evidence of paint coating failure and corrosion.
Recent events (3)
- · F (O) $5000
- · C (S) $5000
- · Z (S) $5000
1910.119 L01
- Issued
- Jan 20, 2015
- Abate by
- Feb 20, 2015
- Penalty
- Initial $5,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not implement procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process: (a) Machine room, anhydrous ammonia refrigeration process: On or prior to 7/24/14, management of change (MOC) procedures were not implemented to reflect process changes associated with installation of a continuous ventilation fan in the machine room.
Recent events (3)
- · F (S) $0
- · C (S) $5000
- · Z (S) $5000
1910.119 L04
- Issued
- Jan 20, 2015
- Abate by
- Feb 20, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(l)(4): If a change covered by this paragraph results in a change in the process safety information required by paragraph (d) of this section, such information shall be updated accordingly: (a) Machine room, Anhydrous Ammonia Refrigeration process: On or prior to 7/24/14, Process Safety Information (minimum ventilation worksheets) were not updated to reflect installation of a continuous ventilation fan.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
More inspections at Sysco Albany, LLC
View Sysco Albany, LLC's full OSHA safety record →
More inspections in this industry (NAICS 424490)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339864969.