NEW YORK, NY —
OSHA Inspection: MARBLEXCHANGE CUSTOM STONE & TILE WORK, INC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of MARBLEXCHANGE CUSTOM STONE & TILE WORK, INC in 40 WEST 57TH STREET, NEW YORK, NY 10011 (NAICS 238340). OSHA activity number 339875791.
Where did this inspection happen?
- Establishment
- MARBLEXCHANGE CUSTOM STONE & TILE WORK, INC
- Site address
- 40 WEST 57TH STREET
- City
- NEW YORK
- State
- NY
- ZIP
- 10011
- Mailing
- 310 NASSUA AVE, BROOKLYN, NY 11222
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238340
- Employees
- 10
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.300 B01
- Issued
- Penalty
- Initial $2800.00 · Current $1790.00 Reduced
General-duty citation text
29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use: LOCATION: 18th floor renovation, 40 west 57th Street, NY NY 10019, by electrical panel and by bathroom on Northwest corner of project. On or About July 31, 2014 A). Employees were utilizing a Makita brand 4" grinder which was not protected or fitted with the designed wheel guards in place.
Recent events (2)
- — I (S) $1790
- — Z (S) $2800
1926.404 F06
- Issued
- Penalty
- Initial $2400.00 · Current $1530.00 Reduced
General-duty citation text
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: LOCATION: 40 West 57th Street, New York, NY 10019, 18th Floor North side by bathroom. On or About July 31, 2014, (a)Employees installing tile in the bathroom on the north side of the project were exposed to electrical shock hazards because the ground pin had been removed/broken off on the flexible extension cords being used to power thier grinder.
Recent events (2)
- — I (S) $1530
- — Z (S) $2400
More inspections in this industry (NAICS 238340)
BAY CITY, MI—2026-07-06
TRI-CITY CUSTOM TILE
LEBANON, PA—2026-07-01
ROME MASONRY AND CONSTRUCTION, LLC
LEBANON, PA—2026-07-01
ROME MASONRY AND CONSTRUCTION, LLC
FRANKFORT, IN—2026-06-16
CUSTOM BUILDING PRODUCTS LLC
VANCOUVER, WA—2026-06-04
WA317991659 - MASTER CRAFT TILE
More inspections in NY
MAYVILLE, NY—2026-07-16
MAYVILLE VILLAGE DPW
NEW HYDE PARK, NY—2026-07-16
NORTH HEMPSTEAD TN MICHAEL J TULLY PARK
CONESUS, NY—2026-07-16
CONESUS TN HIGHWAY DEPT
COMSTOCK, NY—2026-07-15
NYSDOCCS WASHINGTON CORRECTIONAL FACILITY
BALDWINSVILLE, NY—2026-07-15
LYSANDER TOWN HIGHWAY DEPARTMENT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339875791.